Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Reclamation cost summary for The Orr Pit <br /> Site: The Orr Pit Permit Action: 2023 Inspection ANM Permit/Job#: M2009074 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 3/14/2023 County: Pueblo Filename: <br /> User: ANM <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Cut/Fill Working Face DOZER 1 4.20 $1,188 <br /> 002 Rip Mine Floor for Grading GRADER 1 17.50 $3,185 <br /> 003 Grade Mine Floor GRADER 1 15.79 $2,874 <br /> 004 Spread Gravel on Remaining Mine Floor DOZER 1 5.93 $1,678 <br /> 005 Revegetate Mine Slopes REVEGE 1 5.00 $3,705 <br /> 006 Mob/Demob of Reclamation Equipment MOBILIZE 1 2.27 $2,916 <br /> L_ SUBTOTALS: 50.69 $15,546 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $314 <br /> Performance bond: 1.05 Total= $163 <br /> Job superintendent: 25.35 Total= $1,904 <br /> Profit: 10.00 Total= $1,555 <br /> TOTAL O&P= $3,936 <br /> CONTRACT AMOUNT(direct+O&P)= $19,482 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $828 <br /> Reclamation management and/or administration: 5.00 $974 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $6,238 <br /> TOTAL BOND AMOUNT(direct+indirect)= $21,784 <br />