My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-03-24_PERMIT FILE - M2022013 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022013
>
2023-03-24_PERMIT FILE - M2022013 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2023 12:31:09 PM
Creation date
3/24/2023 12:22:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022013
IBM Index Class Name
Permit File
Doc Date
3/24/2023
Doc Name Note
Cover Letter
Doc Name
Adequacy Review Response
From
Raptor Materials, LLC
To
DRMS
Email Name
RDZ
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 8120 Gage Street• Frederick,CO 80516 <br /> Bus:(303)666-6657 •Fax:(303)666-6743 <br /> Friday 24 March 2023 <br /> To: Robert D.Zuber, P.E. <br /> Environmental Protection Specialist <br /> Colorado Division of Reclamation Mining and Safety <br /> Office of Mined Land Reclamation (OMLR) <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> From:Garrett C.Varra, General Manager <br /> Raptor Materials, LLC <br /> 8120 Gage Street <br /> Frederick, Colorado 80516 <br /> Subject: Two Rivers Sand, Gravel and Reservoir Project, File No. M-2022-013, 112c Permit <br /> Application Adequacy Review#5 REPSPONSE <br /> Dear Rob, <br /> The Division of Reclamation, Mining and Safety(Division/ORMS), Office of Mined Land <br /> Reclamation(OMLR);reviewed the contents of the Original 112c permit application for the Two <br /> Rivers Sand, Gravel and Reservoir Project(TRP), File No. M-2022-013 and submitted comments <br /> via Adequacy Letters of 24 June and 5 August 2023 which were responded to by Raptor <br /> Materials on 6 September 2022, Raptor Materials received a Second Adequacy Review dated 17 <br /> October 2022 which were responded to by Raptor Materials on 4 January 2023. In addition to <br /> the Second Adequacy Review dated 17 October 2022, DRMS on November 17, 2022 provided <br /> an additional comment on the berm failure analysis included in the application. Raptor <br /> submitted a supplemental response to the Second Adequacy on 2 February 2023 addressing <br /> excavation setbacks from the South Platte and Big Thompson rivers. Raptor Materials received <br /> Third Adequacy Reviews dated 09 February, 10 February and 14 February 2023,which were <br /> responded to on 24 February, 2023. A Fourth Adequacy Review was received 6 March, 23 and a <br /> response submitted 9 March, 2023. <br /> Raptor Materials received a Fifth Adequacy Review dated 21 March 2023. Raptor's fifth <br /> adequacy response below follow the comment from the adequacy review and are highlighted <br /> in blue font for clarity. <br />
The URL can be used to link to this page
Your browser does not support the video tag.