Laserfiche WebLink
reclamation activities by RM are determined to be a significant contributing factor to <br /> the groundwater impacts,the impacts will be mitigated by RM to the satisfaction of <br /> the Division. <br /> o The mitigation actions discussed in the plan should include one or more of the <br /> following:the use of a recharge pond(or ponds),improvements to the wells,and the <br /> supply of alternative sources of water. <br /> Raptor consultant AWES have updated the Groundwater Monitoring Plan, Raptor Two <br /> Rivers Mine, Section 2.5, Contingency Plan and Abatement, to address this comment. <br /> The revised Groundwater Monitoring Plan is provided as Addendum 15 to Exhibit G. <br /> • The Division recommends that RM obtain agreements with well owners who may be impacted <br /> by the TRIP.These include the owners of the Shable and Lafarge wells,and possibly the Dos <br /> Rios well owner.The agreement shall state that RM will mitigate any negative impacts to <br /> these wells. <br /> Raptor consultant AWES have addressed this comment in the updated the Groundwater <br /> Monitoring Plan, Raptor Two Rivers Mine, Section 2.5, Contingency Plan and <br /> Abatement. The revised Groundwater Monitoring Plan is provided as Addendum 15 to <br /> Exhibit G. <br /> 6.4.12 Exhibit L- Reclamation Costs <br /> Item 51)This exhibit should be updated, as necessary, to match any revisions to Exhibits D and <br /> E, per the adequacy items for those sections.This includes details on structures. <br /> • An apparent error in the text should be addressed. Regarding the dewatering calculations on <br /> page 5,the total cost has likely not been updated.The Division calculates that the value <br /> should be$12,427.45 rather than$12,352.35. Please revise this or explain the apparent error. <br /> Raptor have corrected the error and updated Exhibit L. <br /> Please find attached the following documents as our response: <br /> - Current 112 Form (for reference, unchanged from previous) <br /> - Updated Exhibit C1 Map- Existing Conditions <br /> - Updated Exhibit L- Reclamation Costs <br /> - Updated Exhibit G Map-Water Information <br /> - Revised Groundwater Monitoring Plan (Exhibit G,Addendum 15) <br /> - Revised Water Well Detail (Exhibit G,Addendum 16) <br /> The current decision date is 31 March 2023. <br /> Regards G <br /> Garrett Varra <br /> General Manager <br />