March 6, 2023 C-1981-018/Deserado Mine CCW <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection R -Roads <br /> N -Availability of Records N -Reclamation Success <br /> N -Backfill &Grading N -Revegetation <br /> N -Excess Spoil and Dev.Waste N - Subsidence <br /> N -Explosives N - Slides and Other Damage <br /> R -Fish &Wildlife R - Support Facilities On-site <br /> R -Hydrologic Balance Y - Signs and Markers <br /> Y -Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N -Other N - Special Categories Of Mining <br /> R -Processing Waste Y -Topsoil <br /> COMMENTS <br /> This report documents the observations made by the Division during a partial inspection of the <br /> Deserado Mine on March 6, 2023. The inspection conducted on March 6 was originally planned <br /> for the month of February 2023. Due to winter conditions, the inspection was delayed. The <br /> inspection was completed by Clayton Wein of the Division. Rich ... represented Blue Mountain <br /> Energy during the inspection. The weather started with mostly clear skies turning to overcast <br /> with a temperature of 27 degrees F. The ground at the mine site was covered with 16-18 inches <br /> of snow. <br /> FISH and WILDLIFE—Rule 4.18: <br /> During the inspection, 3 separate groups of deer were seen. One was located by the DP-1 pond, another <br /> group was spotted next to the access road to the B Seam Vent Shaft No. 1, and the last group was observed on the <br /> north side of the haul road just east of the intersection of CR-65 and the haul road. <br /> HYDROLOGIC BALANCE -Rule 4.05 <br /> Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br /> Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br /> Drainage—Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> There are 3 ponds located within the main facilities/portals area of the mine. The DP-1 pond,the PP-1 <br /> pond and the PP-2 pond. During the inspection the DP-1 pond and the PP-2 pond were frozen over and <br /> completely covered with snow(Photos 1 and 2). There were no observed indications of instability or erosion on <br /> the ponds' embankments. Discharge from DP-1 was difficult to determine due to the depth of the snow. No <br /> discharge from PP-2 was occurring. The PP-1 pond was holding water with no discharge observed from the pond. <br /> The embankments were covered with snow. No erosional features or indications of instability were observed. <br /> Drainage control structures within the main facilities/portals area were observed to be functioning to transport <br /> runoff to the DP-1 pond. Some ditches were observed to be filled with snow. There were no observed signs of <br /> channel erosion or off-site impacts. The main facilities/portals area benches wee muddy with some small amounts <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 2 of 9 <br />