Laserfiche WebLink
2.01.5 2.03.4 2.03.5 <br /> 2.03.6 2.03.7 2.03.8 <br /> 2.03.9 2.03.10 2.03.12 <br /> 2.04.3 2.04.4 2.04.5 <br /> 2.04.6 2.04.7 2.04.9(1)-(3) <br /> 2.04.10 2.04.11(1)-(4) 2.04.12 <br /> 2.05.2(1)(2) 2.05.3(1, 2a, 2b) 2.05.3(3) <br /> 2.05.3(4) 2.05.3(5) 2.05.3(6) <br /> 2.05.3(8) 2.05.4 2.05.5 <br /> 2.05.6(2) 2.05.6(3) 2.05.6(4) <br /> 2.06.4 2.06.5 2.06.9 <br /> 2.10 3.02.2 4.03 <br /> 4.05 4.05.5 4.05.6 <br /> 4.05.9 4.05.13 4.05.14, 4.05.15 <br /> 4.08 4.11.4 4.14 <br /> 4.14.3 4.15 4.16 <br /> 4.18(1),(2), (5) 4.23 4.24 <br /> 4.25 4.27 <br /> V Revised Pates,Tables and Maps:Revised Pates,Tables and Maps: <br /> DRMS's evaluation of the proposed revision with respect to these rules follows. Adequacy <br /> review questions are numbered and italicized. Items deemed adequately addressed in <br /> previous reviews are not repeated below. <br /> Revised page 2-170 states that the permit area was expanded with the PR7 and PR11 revisions <br /> and that no previous mining occurred within the pit expansion areas. From Map M4, Life of <br /> Mine Plan, submitted with the proposed revision PR11, C Pit was previously mined. DRMS <br /> understands that PR11 proposes highwall mining seams in C Pit. <br /> 1. Please clarify the,following statement with respect to C Pit of- <br /> No previous mining occurred within the pit expansion areas with respect to C Pit. <br /> DRMS 28 February 2023 <br /> Trapper Response to Comment 1: C Pit mining is included as part of the proposed PR-I I mine plan. It is <br /> not however,included as part of the PR-II permit area expansion,which has had no historic mining. The <br /> Permit area expansion is north of historic C Pit mining and only includes that area that is new to the permit <br /> area.The C Pit area was already included within the existing permit area. <br /> DRMS finds Trapper Mines' response adequate. <br /> 2 <br /> Trapper Mine PR I ADQ No 2 <br /> 2023 February <br />