My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991-04-11_GENERAL DOCUMENTS - C1981031
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981031
>
1991-04-11_GENERAL DOCUMENTS - C1981031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2023 2:38:49 PM
Creation date
2/27/2023 9:23:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981031
IBM Index Class Name
General Documents
Doc Date
4/11/1991
Doc Name Note
New Pryor Closeout
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 4/02/90 <br /> If the CONTRACTOR should fail to prosecute the work properly and diligently, <br /> or default performance of any provision of the purchase order and its <br /> collateral documents, the OWNER after seven days written notice to the <br /> CONTRACTOR and his surety may, without prejudice to any other remedy the OWNER <br /> may have, dismiss the CONTRACTOR and complete the work and may deduct the cost <br /> of so doing from any unpaid balance of the contract price due or to become due <br /> the CONTRACTOR. If such cost of completion of the work is in excess of the <br /> unpaid balance of the contract price, the CONTRACTOR shall reimburse the OWNER <br /> for such excess or the OWNER shall have cause of action at law for the amount <br /> of such excess and all costs of prosecution of such action. <br /> 10. LIQUIDATED DAMAGES <br /> If the CONTRACTOR shall neglect, fail or refuse to complete the work within <br /> the time agreed upon in this purchase order contract or any extension thereof, <br /> the CONTRACTOR shall be liable to the OWNER in the amount specified the <br /> Special Conditions for this project for each and every calendar day the <br /> completion of the work is delayed beyond the time provided in this purchase <br /> order contract, as fixed and agreed liquidated damages and not as a penalty. <br /> If the OWNER terminates the CONTRACTOR'S right to proceed, the resulting <br /> damage will consist of liquidated damages until such reasonable time as may be <br /> required for final completion of the work along with any increased costs <br /> incurred by the OWNER in completing the work. If the OWNER does not terminate <br /> the CONTRACTOR'S right to proceed, the resulting damage will consist of <br /> liquidated damages until the work is- completed or accepted. <br /> The OWNER shall have the right to deduct from and retain out of monies which <br /> may be due or which may become due and payable to the CONTRACTOR, the amount <br /> of such liquidated damages; and if the amount so retained by the OWNER is <br /> insufficient to pay in full such liquidated damages, the CONTRACTOR shall pay <br /> to the OWNER the amount necessary to effect payment in full of such liquidated <br /> damages. <br /> 11 . PLANS AND WORKING DRAWINGS <br /> The drawings if any, included with this specification are complete and <br /> adequate for construction. While every effort has been made to have the plans <br /> and drawings free of errors and ambigui ties, any such points must be brought <br /> to OWNER'S attention immediately. The successful bidder will be provided with <br /> two (2) full sized sets of drawings. <br /> 12. DAILY JOB LOGS <br /> The CONTRACTOR will be required to fill out daily job logs, which will be <br /> provided by the PROJECT MANAGER. Completed daily job logs should be submitted <br /> to the PROJECT MANAGER on a weekly basis. A sample is attached. <br /> MLRD-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.