My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991-04-11_GENERAL DOCUMENTS - C1981031
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981031
>
1991-04-11_GENERAL DOCUMENTS - C1981031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2023 2:38:49 PM
Creation date
2/27/2023 9:23:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981031
IBM Index Class Name
General Documents
Doc Date
4/11/1991
Doc Name Note
New Pryor Closeout
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4/02/90 <br /> 7. PROJECT SCHEDULE <br /> The successful bidder shall , within ten (10) days after receipt of the Notice <br /> of Award, and prior to issuance of a Purchase Order, furnish a plan for <br /> construction of the work showing (1 ) the date(s) he expects to move various <br /> pieces of equipment onto the work site, and (2) the dates and period(s) he <br /> proposes to perform each phase of the project work. <br /> 8. NOTICE TO PROCEED <br /> After a Purchase Order has been issued, the OWNER will issue Notice to <br /> Proceed. Under no circumstances shall the CONTRACTOR begin work before a <br /> Notice to Proceed is issued. <br /> 9. WORK PROGRESS <br /> The CONTRACTOR agrees that work will be performed with due diligence in <br /> accordance with good engineering and construction practices to the end that <br /> the entire contract work shall be completed within the time specified in the <br /> Special Conditions after receipt of the Notice to Proceed. It is expressly <br /> understood and agreed, by and between the parties hereto, that the stipulated <br /> performance time for completion of the work described is a reasonable time for <br /> completion of the work, taking into consideration all factors, including <br /> average climatic conditions prevailing in the area. <br /> For good and sufficient cause, such as (a) unsuitable weather, (b) faulty <br /> workmanship, (c) improper superintendence, (d) the CONTRACTOR'S failure to <br /> carry out any reasonable order or to perform any provision of the purchase <br /> order and collateral documents, or (e) any other circumstance unfavorable for <br /> prosecution of the work, the OWNER shall have the right to suspend the <br /> CONTRACTOR'S performance of the work . Notice of such suspension shall be in <br /> writing. The CONTRACTOR shall resume performance of the work promptly when so <br /> notified in writing. There will be added to the time estimated for the <br /> project work noted in the Special Conditions the number of days, if any, that <br /> the CONTRACTOR is allowed for reasons of unusual , unsuitable weather as <br /> stipulated above. The CONTRACTOR shall not be entitled to any cost or <br /> damages resulting from such suspension. No extension of time shall be allowed <br /> for reasons as stipulated in (b), (c), and (d) above. <br /> If the CONTRACTOR is responsible for a delay in progress of the work, the <br /> CONTRACTOR shall , without additional cost, work overtime and utilize such <br /> additional equipment and manpower as may be necessary to complete the contract <br /> work by the stipulated date. Failure to comply will be grounds for <br /> termination of this Agreement as stipulated below or assessment of liquidated <br /> damages as stipulated under the Liquidated Damages clause of these General <br /> Conditions. <br /> MLRD-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.