Laserfiche WebLink
4/02/90 <br /> 7. PROJECT SCHEDULE <br /> The successful bidder shall , within ten (10) days after receipt of the Notice <br /> of Award, and prior to issuance of a Purchase Order, furnish a plan for <br /> construction of the work showing (1 ) the date(s) he expects to move various <br /> pieces of equipment onto the work site, and (2) the dates and period(s) he <br /> proposes to perform each phase of the project work. <br /> 8. NOTICE TO PROCEED <br /> After a Purchase Order has been issued, the OWNER will issue Notice to <br /> Proceed. Under no circumstances shall the CONTRACTOR begin work before a <br /> Notice to Proceed is issued. <br /> 9. WORK PROGRESS <br /> The CONTRACTOR agrees that work will be performed with due diligence in <br /> accordance with good engineering and construction practices to the end that <br /> the entire contract work shall be completed within the time specified in the <br /> Special Conditions after receipt of the Notice to Proceed. It is expressly <br /> understood and agreed, by and between the parties hereto, that the stipulated <br /> performance time for completion of the work described is a reasonable time for <br /> completion of the work, taking into consideration all factors, including <br /> average climatic conditions prevailing in the area. <br /> For good and sufficient cause, such as (a) unsuitable weather, (b) faulty <br /> workmanship, (c) improper superintendence, (d) the CONTRACTOR'S failure to <br /> carry out any reasonable order or to perform any provision of the purchase <br /> order and collateral documents, or (e) any other circumstance unfavorable for <br /> prosecution of the work, the OWNER shall have the right to suspend the <br /> CONTRACTOR'S performance of the work . Notice of such suspension shall be in <br /> writing. The CONTRACTOR shall resume performance of the work promptly when so <br /> notified in writing. There will be added to the time estimated for the <br /> project work noted in the Special Conditions the number of days, if any, that <br /> the CONTRACTOR is allowed for reasons of unusual , unsuitable weather as <br /> stipulated above. The CONTRACTOR shall not be entitled to any cost or <br /> damages resulting from such suspension. No extension of time shall be allowed <br /> for reasons as stipulated in (b), (c), and (d) above. <br /> If the CONTRACTOR is responsible for a delay in progress of the work, the <br /> CONTRACTOR shall , without additional cost, work overtime and utilize such <br /> additional equipment and manpower as may be necessary to complete the contract <br /> work by the stipulated date. Failure to comply will be grounds for <br /> termination of this Agreement as stipulated below or assessment of liquidated <br /> damages as stipulated under the Liquidated Damages clause of these General <br /> Conditions. <br /> MLRD-5 <br />