My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991-04-11_GENERAL DOCUMENTS - C1981031
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981031
>
1991-04-11_GENERAL DOCUMENTS - C1981031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2023 2:38:49 PM
Creation date
2/27/2023 9:23:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981031
IBM Index Class Name
General Documents
Doc Date
4/11/1991
Doc Name Note
New Pryor Closeout
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 1 Mobil ization and Demobilization <br /> a) Mobil ization <br /> This task includes moving equipment and supplies to the project area. If <br /> desired, the CONTRACTOR may establish a staging area for the storage of <br /> all equipment and supplies. The area shall be of adequate size to <br /> accommodate all of the CONTRACTORS vehicles , equipment, and supplies and <br /> shall be approved by the PROJECT MANAGER. The CONTRACTOR shall minimize <br /> impact on the staging area with regard to noise, dust, and fumes . The <br /> CONTRACTOR shall be responsible for maintaining security of the staging <br /> area. <br /> This task also includes all labor and costs associated with locating and <br /> protecting utilities, both above ground and underground, at the work site. <br /> See also Section 1 .0 of the "Standard Work Specifications" included in <br /> CMLRD General Bid Specifications, 1989. <br /> b) Demobilization <br /> This item shall include all labor, equipment, and costs associated with <br /> demobilization and clean-up of the work site to its original or better <br /> condition . All equipment and supplies , materials, and debris related to <br /> this project will be -removed from the site upon completion. The <br /> CONTRACTOR shall also reclaim any staging area or other ground disturbed <br /> during the course of the project located outside of the project area as <br /> defined by this Bid Document. All haul roads shall be fully regraded and <br /> reclaimed upon completion of the project. Additional final grading shall <br /> be accompl ished to reduce oversteep slopes , if needed. <br /> See also Section 1 .0 of the "Standard Work Specifications" included in <br /> CMLRD General Bid Spe ci fi ca ti on s, 1989. <br /> The CONTRACTOR shall exercise caution during mobilization, performance of <br /> all work tasks, and demobilization in order to avoid damage to public and <br /> private property including, but not limited to, pavements, soils, <br /> vegetation , water supplies , fences , walls , structures, existing sediment <br /> ponds, landscaping etc. The CONTRACTOR shall repair and restore public <br /> or private property damaged during the work at his expense. <br /> The CONTRACTOR shall be fully responsible for any and all damage to <br /> property caused by his equipment or personnel . The CONTRACTOR shall <br /> ensure that the job site is restored to original or better condition and <br /> that the PROJECT MANAGER accept that the work is complete. <br /> -5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.