My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-17_GENERAL DOCUMENTS - P1980086
DRMS
>
Day Forward
>
General Documents
>
Prospect
>
P1980086
>
2009-08-17_GENERAL DOCUMENTS - P1980086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 1:53:29 PM
Creation date
2/27/2023 9:23:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P1980086
IBM Index Class Name
General Documents
Doc Date
8/17/2009
Doc Name Note
Mascot Tunnel Closeout-BF/ST
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division <br /> of Reclamation, roj ect Summary <br /> Mining & Safety <br /> Mascot Tunnel Project 2009, continued... <br /> The project was ready for final inspection on July 23, .. ' <br /> 2009. The Brasscap was stamped at that time. DRMS ' <br /> i it <br /> installed a lock (#E-1880) on the tunnel closure per _ ,, <br /> landowner request. The key to this lock was mailed - liallt <br /> certified to the landowner on August 3, 2009. . - <br /> _. <br /> Change Orders - _ ►- <br /> There were no change orders. The final construction `1"*. Olt. <br /> HIM <br /> cost was $10,380.00 ; i -Pe I it i <br /> Future Monitoring And Maintenance1 il MN <br /> NM <br /> The mine closure should be checked annually to assess Ilii 4 <br /> the effects of erosion and to ensure their integrity. MID <br /> Vandalism at this site is probable, due to the proximity to ' <br /> Highway 119. Completed Mascot Tunnel portal closure with bat ladder and access. <br /> _ ♦ ♦ ' ' ' <br /> eg <br /> : AIN -14 1 ' '‘ _rh .,,,,w ,. <br /> ger _,,-=114 ' „.,4.- - -.- ''‘073,;;-`'D i'1`,, " 4" - . Asit. 4. <br /> ,,A.4,-...--- • <br /> Overview of the completed Mascot Tunnel portal closure. <br /> Y ' <br /> '►1 <br /> ✓ Project Data <br /> ` ', ' Mascot Tunnel Project: <br /> 2 closure,Completed 23-July-2009 <br /> Brasscap monument on subsidence closure above the Mascot Tunnel portal. Construction Cost: <br /> $10,380.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.