By the afternoon on August 24, the entire waste rock pile had been graded and an earthen berm was constructed along the <br /> top perimeter for safety and to reduce erosion along the newly graded slopes. The following day, all disturbed areas were <br /> fertilized with Biosol®(7-2-3)and seeded, the remaining debris was hauled to the landfill, and the salvageable steel was <br /> consolidated on the southeast portion of the mine site. On the last day, August 26, two hundred and twenty-five bales of <br /> wood straw mulch was delivered and applied to all disturbed slopes to achieve approximately 60% coverage. With the <br /> specified project tasks completed, the contractor demobilized all equipment and personnel from the project site that evening. <br /> Remaining Reclamation Requirements and Estimated Cost: <br /> All goals listed in the reclamation plan were accomplished as specified. The site will be monitored annually for several years <br /> to ensure the success of the revegetation and the project overall. No future reclamation is anticipated at this time. <br /> 1) 3) <br /> Project Manager P .ject Manager <br /> 2,C- /3 2 _ z: - (3 <br /> Date Date <br /> 2) 4) <br /> Grants Officer a)AMLIS(Deb)/b)BrassCap(Yvonne;then to Kristin for filing) <br /> Date Date <br />