Colorado Inactive Mine Reclamation Program <br /> CLOSEOUT REPORT <br /> LEVICY BOND FORFEITURE PROJECT <br /> Introduction: The Levicy project was developed to complete the reclamation requirements that were not completed by the <br /> operator under their reclamation permit. The project was completed by closing the main adit, an open shaft, a collapsing <br /> shaft, and an exploration pit. Additional reclamation activities included grading the disturbed areas, road grading to <br /> oromote non-erosive drainage across the road, and removing trash and debris from the site. <br /> Permit Information <br /> Permit Number Operator Name Mine Name <br /> M-1978-79 Roy F. Carpenter Levicy Mine <br /> Type of Mine-Hardrock Commodity Mined: Ag and Pb <br /> PRE-RECLAMATION SITE CONDITIONS <br /> The Levicy Mine site is located 5.5 miles north of Forest Road 742, on Forest Road 584 (Tellurium Creek). An <br /> application for Mining and Reclamation Activities, Limited Impact Operations permit was issued to Roy F. <br /> Carpenter in 1978. The mining permit was revoked and the financial warranty forfeited by the State of Colorado <br /> in 2004. The site has been obtained by the U.S. Forest Service, and is currently managed by the Gunnison <br /> Ranger District. The entrance to the Levicy site was unprotected from ATV users and backcountry users, <br /> presenting a safety hazard. <br /> BIDDING/CONSTRUCTION INFORMATION <br /> 'DRMS received six bids for this project. The low bidder was Red Dog Enterprises with a bid of$24,995.00 <br /> Type of Bid Documented Quote <br /> (circle one) Formal - Bid as the Levicv Mine Revocation Project, PKA-9-609 <br /> PO Number Contractor Name &Address Construction Bond Amount <br /> Red Dog Enterprises Dates $4,255.00 <br /> OE-PKA-09000000072 PO Box 452 Start: 09/09/2009 <br /> Hotchkiss, CO 81419 End: 09/18/09 USFS Match: $20,245.00 <br /> PO Date Project Cost <br /> 06/09/09 $24,500.00 <br /> Construction Work Description <br /> Red Dog Enterprises mobilized to the site on September 9, 2009, and completed construction on September 17, 2009. The <br /> main adit was backfilled, and the area in front of the adit was graded. The open shaft was closed using Polyurethane Foam <br /> and rock for backfill. The collapsing shaft and the exploration pit were backfilled with on-site waste materials and graded to <br /> drain. The access road was graded and drainages were constructed to promote non-erosive drainage from the road. <br /> Additionally all remnant structures, trash, and debris were removed from the site. No revegetation was completed at this site <br /> due to the lack of vegetation in the general vicinity of the project area and the extreme altitude and weather conditions at the <br /> site. <br /> Remaining Reclamation Requirements and Estimated Cost <br /> NONE <br /> 1 3) �� <br /> jl' /.e Senior Project Manager <br /> Prole a AA <br /> 1734Th <br /> J <br /> Date Date <br /> 2) 4) <br /> Grants Officer a)AMLIS (Deb)/b) BrassCap(Yvonne; then to Kristin for filing) <br /> Date Date <br /> As of 05/14/09 <br />