During this time, hand crews were busy shuttling tools and straw mulch to a staging area just outside of the Wilderness area. <br /> Pack animals then hauled these supplies to various strategic points along the access road. Once the job site was prepared, <br /> hand crews spent roughly one (1) week completing the specified tasks including repairing erosional features along the newly <br /> reclaimed access road, construction of a foot trail along the length of the road, placement of straw bales at the lower mine <br /> entry to correct severe erosion and mitigate sediment transport, and reseeding and mulching of all disturbed areas. <br /> On the afternoon of August 30th, two (2) members of the Gunnison National Forest were onsite to designate locations for <br /> water bar placement along Tellurium Creek Rd. Water bar construction and additional minor road improvements were <br /> completed over the next few days and by September 3, 2010, the reclamation work was complete and ready for inspection. <br /> Final Inspection was completed by the DRMS Project Manger on September 7, 2010 with no exceptions. <br /> In addition to the reclamation activities stated above, an interpretive sign was designed and will be placed onsite in 2011, to <br /> discuss the history of the Enterprise Mine, its significance in the mining district, and the reclamation efforts undertaken. The <br /> interpretive sign was a collaboration between the United States Forest Service, Gunnison National Forest, the Colorado <br /> Division of Reclamation, Mining and Safety, and Notchcode Creative. <br /> Remaining Reclamation Requirements • Estimated • <br /> The reclamation work completed at the Enterprise Mine will be monitored for integrity over the next few years. No further <br /> f3) <br /> Project Manage Senior Project Manager <br /> /2/ <br /> Date Date <br /> 2) 4) <br /> Grants Officer a)AMLIS (Deb)/b) BrassCap(Yvonne;then to Kristin for filing) <br /> Date Date <br /> • <br /> As of 05/14/09 <br />