Laserfiche WebLink
FINAL INSPECTION AND <br /> CERTIFICATE OF COMPLETION COLORADO DIVISION OF <br /> RECLAMATI ,MINING AND SAFETY <br /> 1313ONSherman St.,Rm.215 <br /> Denver,CO 80203-2273 <br /> (303)866-3567 <br /> Date <br /> Project Name <br /> Fortune Tunnel Bond Forfeiture Project 12/12/08 <br /> Contractor Name Bid# <br /> Berry Trucking and Excavating, Inc. P-1983-079 <br /> Contractor Address Project# <br /> 856 S.Ammons St. P-1983-079 <br /> PO or Contract# <br /> Littleton,CO 80128 Direct Bill <br /> Project Manager <br /> Erica S.Crosby <br /> This is to certify that all work under the above Agreement was ready for final inspection on (date) 12/02/08 ;that the <br /> work was completed in accordance with the requirements of the agreement with the following exceptions: <br /> NO EXCEPTIONS <br /> , , t <br /> sk • <br /> y. .r t`.•t+� <br /> 2 4,1 , � l ` <br /> w- <br /> e.:4,1-;,..".•• • <br /> x ,'*`i -K�S lP,rtp • ;1 � (-L <br /> 4104. <br /> ^e - tea + '� * <br /> \ ` �.. <br /> `t <br /> ✓ et a-' ;\ <br /> a., ffiig� <br /> :moi ` <br /> .y , - <br /> (attach additional pages,if required) <br /> and it is re mended that, upon completion of the exceptions listed above,the work under this Agreement be accepted. <br /> DRMS Pr.'-ct Lana•= Si••ature The above exceptions were completed on (date): <br /> .4 ,- ' Ili ,p <br /> DRMS Project Manager <br /> 12/02 Sheet of <br />