My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-02-24_PERMIT FILE - M2022013 (8)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022013
>
2023-02-24_PERMIT FILE - M2022013 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2023 4:16:34 PM
Creation date
2/24/2023 4:05:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022013
IBM Index Class Name
Permit File
Doc Date
2/24/2023
Doc Name Note
Exhibit D - Extraction Plan
Doc Name
Adequacy Review Response #3
From
Raptor Materials, LLC
To
DRMS
Email Name
RDZ
MAC
LDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 119 <br /> 6.4.4 EXHIBIT D — Extraction Plan <br /> `... that head cutting/erosion will not progress through the full length of <br /> a 100-ft riverside berms. It is important to note that should a flood occur <br /> that results in head cutting/erosion of a riverside berm, Varra <br /> Companies, Inc. will act diligently to restore the damaged areas to pre- <br /> flood conditions. <br /> As mentioned, this analysis is conservative and riverside head <br /> cutting/erosion is based on the 100-yr flood. There is a small probability <br /> that such a flood event could occur during extraction and when the pit is <br /> dewatered. <br /> The DRMS in a supplemental adequacy response dated November 17, 2022 <br /> challenged the validity of the engineered design approach taken by Flow <br /> Technologies despite having accepted it as valid in the past. Raptor Materials <br /> believes the approach is valid and is in the process of performing an analysis <br /> by alternate methods incorporated in HEC-RAS. This, however, will take time. <br /> Raptor has per DRMS suggestion decided to adopt the 400-foot setback from <br /> the top of the riverbanks to the top of the pit-side slope based on guidance <br /> developed using generic and non-site-specific empirical methods as adopted by <br /> the Mile High Flood District whose jurisdiction does not include the proposed <br /> operation. Raptor Materials intends after permit approval to present the results <br /> of the ongoing engineering evaluation as a Technical Revision to obtain relief <br /> from what we are confident are extreme setbacks. <br /> During extraction, a predominantly vertical advancing pit wall (the extraction <br /> front) is not anticipated due to the use of excavators in the removal of the <br /> material deposits. Excavators provide a great deal of control over the <br /> extraction process. The maximum length of the extraction front will likely <br /> never exceed the length of one side of a quarter section of land, or 1,3 20± f eet, <br /> or less; in any given direction. The advancing front will result in a moving face <br /> with a slope typically equal to or flatter than 1.2 5H:1V, and commonly not <br /> greater than 1.2 5H:1V along the perimeter of the extraction limits to depth. <br /> The exception to cut perimeter slopes is shown with a distinct Red Boundary on <br /> Exhibit C-2: Extraction Plan Map, where cut slopes will not exceed 2H:1V in <br /> order to maintain integrity and stability along that designated perimeter area <br /> (refer to the AWES Slope Stability Analyses of 23 December 2019, located at the <br /> back of this exhibit). Internal transport of extracted materials to conveyor <br /> systems or other internal transport; or otherwise by approved public roadways, <br /> will be used in the transportation of extracted materials to the designated <br /> plant/stockpile location, described in greater detail, below. <br /> Acreage to be affected during the first year of extraction activities include the <br /> establishment of the initial Wash Pond and attending Settling Pond(s), Plant <br /> VARRA COMPANIES, INC. TWO RIVERS SAND GRAVEL AND RESERVOIR PROJECT MARCH 2O22 <br /> A REGULAR IMPACT[1121 CONSTRUCTION PERMIT APPLICATION-COLORADO DIVISION OF RECLAMATION MINING&SAFETY <br /> OFFICE OF MINED LAND RECLAMATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.