My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-02-24_PERMIT FILE - M2022013 (8)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022013
>
2023-02-24_PERMIT FILE - M2022013 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2023 4:16:34 PM
Creation date
2/24/2023 4:05:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022013
IBM Index Class Name
Permit File
Doc Date
2/24/2023
Doc Name Note
Exhibit D - Extraction Plan
Doc Name
Adequacy Review Response #3
From
Raptor Materials, LLC
To
DRMS
Email Name
RDZ
MAC
LDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 118 <br /> 6.4.4 EXHIBIT D - Extraction Plan <br /> performed and approved by the State Engineer. Progressive regrading and <br /> lining however will be performed and is discussed in Exhibit L. <br /> Additional information is provided under Exhibit C-1: Existing Conditions Map; <br /> which shows all known current and active significant man-made structures <br /> located on or within 200 feet of the permit boundary detailed under including <br /> creeks, roads, buildings, oil and gas facilities [such as tanks, batteries, wells and <br /> lines], and power and communication lines and support structures, easements <br /> and rights-of-way; located over the permitted lands or within 200 feet of the <br /> same. A listing of the adjoining surface owner's names and addresses located <br /> within these areas are listed under Exhibit C Text, correlated with those shown <br /> in the afore-mentioned Exhibit C-1: Existing Conditions Map. <br /> The extraction limits assure through the use of setbacks that other interests are <br /> not affected by planned extraction. Extraction is set back uniformly at a <br /> minimum 10.0± feet from the edge of property lines; easements and rights-of- <br /> way; underground gas lines or other underground facilities, irrigation ditches <br /> and seep ditch, wells and other structures. 'Minor variations may occur in the <br /> field over time from those represented on Exhibit Maps. The plans detailed in <br /> this application are based upon future events for which minor or temporary <br /> departures at any point in time may be evident. To the extent any significant <br /> departure in the field occurs in a time and manner not otherwise anticipated in <br /> these exhibits, the operator may cure by self-inspection, by observation from <br /> OMLR inspection in a timely manner, or by operator-initiated Revision to the <br /> Permit or otherwise via clarification in attending required OMLR Annual <br /> Reports. <br /> Extraction will not occur closer than 125± feet' from the face of a residential <br /> structure; unless there is a written accommodation with the owner of the <br /> residential structure that allows extraction to occur within a closer stated limit. <br /> Extraction will occur no closer than 25± feet from well heads and related above <br /> ground facilities. Extraction around well heads will be concurrently backfilled <br /> to maintain a 100± foot buffer from the balance of extracted lands. At all <br /> times, safety will take precedent and over-ride all other conditions in time with <br /> a matter of safety or emergency respective to any and all aspects of the <br /> approved permit. <br /> To minimize the potential of river capture, planned setbacks from the two rivers <br /> was evaluated by Flow Technologies (refer to report at the back of Exhibit G: <br /> Water Information- titled: `Two Rivers Riverside Berm Failure Analysis and Flood <br /> Control Mitigation Plan' of 22 January 2020). The report finds: <br /> 'Adequacy Item 21 <br /> $Adequacy Item 22 <br /> VARRA COMPANIES, INC. TWO RIVERS SAND GRAVEL AND RESERVOIR PROJECT MARCH 2O22 <br /> A REGULAR IMPACT[1121 CONSTRUCTION PERMIT APPLICATION-COLORADO DIVISION OF RECLAMATION MINING&SAFETY <br /> OFFICE OF MINED LAND RECLAMATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.