My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-02-24_PERMIT FILE - M2022013 (8)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022013
>
2023-02-24_PERMIT FILE - M2022013 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2023 4:16:34 PM
Creation date
2/24/2023 4:05:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022013
IBM Index Class Name
Permit File
Doc Date
2/24/2023
Doc Name Note
Exhibit D - Extraction Plan
Doc Name
Adequacy Review Response #3
From
Raptor Materials, LLC
To
DRMS
Email Name
RDZ
MAC
LDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 <br /> 6.4.4 EXHIBIT D — Extraction Plan <br /> The mining plan shall supply the following information, correlated with the affected <br /> lands, map(s) and timetables: <br /> (a)description of the method(s) of mining to be employed in each stage of the operation <br /> as related to any surface disturbance on affected lands; <br /> (b)earthmoving; <br /> (c)all water diversions and impoundments; and <br /> (d)the size of area(s) to be worked at any one time. <br /> (e)An approximate timetable to describe the mining operation. The timetable is for the <br /> purpose of establishing the relationship between mining and reclamation during <br /> the different phases of a mining operation. An Operator/Applicant shall not be <br /> required to meet specific dates for initiation, or completion of mining in a phase <br /> as may be identified in the timetable. This does not exempt an <br /> Operator/Applicant from complying with the performance standards of Rule 3.1. If <br /> the operation is intended to be an intermittent operation as defined in Section 34- <br /> 32.5-103(11)(b)7 C.R.S., the Applicant should include in this exhibit a statement <br /> that conforms to the provisions of Section 34-32.5-103(11)(b)7 C.R.S. Such <br /> timetable should include: <br /> (i)an estimate of the periods of time which will be required for the various stages <br /> or phases of the operation; <br /> (ii)a description of the size and location of each area to be worked during each <br /> phase; and <br /> (iii)outlining the sequence in which each stage or phase of the operation will be <br /> carried out. (Timetables need not be separate and distinct from the <br /> mining plan, but may be incorporated therein.) <br /> (f)A map (in Exhibit C - Pre-Mining and Mining Plan Maps(s) of Affected <br /> Lands, Rule 6.4.3) may be used along with a narrative to present the following <br /> information: <br /> (i)nature, depth and thickness of the deposit to be mined and the thickness and <br /> type of overburden to be removed (may be marked "CONFIDENTIAL," <br /> pursuant to Rule 1.3(3)); and <br /> (ii)nature of the stratum immediately beneath the material to be mined in <br /> sedimentary deposits. <br /> (g)ldentify the primary and secondary commodities to be mined/extracted and describe <br /> the intended use; and <br /> (h)name and describe the intended use of all expected incidental products to be <br /> mined/extracted by the proposed operation. <br /> (i)Specify if explosives will be used in conjunction with the mining (or reclamation). In <br /> consultation with the Office, the Applicant must demonstrate pursuant <br /> to Rule 6.5(4), Geotechnical Stability Exhibit, that off-site areas will not be <br /> adversely affected by blasting. <br /> (j) Specify the dimensions of any existing or proposed roads that will be used for the <br /> mining operation. Describe any improvements necessary on existing roads and <br /> the specifications to be used in the construction of new roads. New or improved <br /> roads must be included as part of the affected lands and permitted acreage. <br /> Affected land shall not include off-site roads which existed prior to the date on <br /> VARRA COMPANIES, INC. TWO RIVERS SAND GRAVEL AND RESERVOIR PROJECT MARCH 2O22 <br /> A REGULAR IMPACT[1121 CONSTRUCTION PERMIT APPLICATION-COLORADO DIVISION OF RECLAMATION MINING&SAFETY <br /> OFFICE OF MINED LAND RECLAMATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.