Laserfiche WebLink
February 21,2023 C-1981-035/King Coal Mine LJW <br /> WPM-.w <br /> Photo Seven: View Northeast,showing the small stockpile of waste material on the <br /> Upper Refuse Pile at the King II Facility. The material is being hauled up from the <br /> lower pad and awaiting placement when conditions allow. <br /> L <br /> •ir�G't'." E�y x. <br /> �i <br /> � Mks:• z -s.` <br /> Photo Eight: View East,showing an example of the Topsoil Stockpiles located at the King II <br /> Facility. The stockpiles are well vegetated and appeared stable at the time of the inspection. <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 7 of 7 <br />