Laserfiche WebLink
February 21,2023 C-1981-035/King Coal Mine LJW <br /> I!IIIIIIIed UP; <br /> WO <br /> 161 <br /> T <br /> ^S <br /> _ Photo Five: Vfew East, showing the temporary refuse stockpile on the Lower Reuse Pile <br /> at the King I Facility. The pile appeared stable at the time of the inspection and no signs <br /> of erosion or material transport was observed. <br /> sr• .`r ` <br /> z <br /> Photo Six: View East,showing the North side of the temporary stockpile. The side <br /> slopes are within the berm of the Lower Refuse Pile and show no signs of instability. <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 6 of 7 <br />