Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task#000 Page 4 of 4 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 1502.00 -8.00 3.00 -5.00 1870 0.956 <br /> Haul Time: 0.956 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 1502.00 8.00 3.00 11.00 1734 1.269 <br /> Return Time: 1.269 minutes <br /> Total Truck Cycle Time: 5.221 minutes <br /> Loading Tool unit <br /> Production 4,328.95 LCY/Hour Adjusted for job efficiency: 3,593.03 LCY/Hour <br /> Truck Unit Production <br /> 1,489.14 LCY/Hour Adjusted for job efficiency: 1,235.99 LCY/Hour <br /> Optimal No.of Trucks: 3 Truck(s) Selected Number of Trucks: 3 Truck(s) <br /> Adjusted hourly truck team production: 3,707.96 LCY/Hour <br /> Adjusted single truck/loader team production: 3,593.03 LCY/Hour <br /> Adjusted multiple truck/loader team production: 3,593.03 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 174.80 Hours <br /> Unit cost: $0.868 /LCY Total job cost: $545,032 <br /> CIRCES Cost Estimating Software <br />