Laserfiche WebLink
Exhibit F Map has been revised as requested. Labels have been added indicating <br /> the regraded and lined excavations are "Developed Water Resources with Grass <br /> Embankments", and an explanatory note added adjacent to the Legend. <br /> 41) Several structures and easements are shown on Exhibit C-1, and none are <br /> shown on Exhibit F. Please explain if all of these structures will be removed during <br /> the mining and reclamation operations. <br /> Raptor Materials First Adequacy Response <br /> Please refer to response to Item 18. <br /> Division Second Adequacy Comment <br /> Please confirm that Exhibit Fis accurate. Are all above ground and underground <br /> structures that will remain after mining is complete shown on the map? <br /> Raptor Materials Second Adequacy Response <br /> Raptor has confirmed in revised Exhibit E that Exhibit F presents Raptor Material's <br /> current expectation of the remaining above ground and underground structures <br /> within Affected Area at the point the reclamation of mining related disturbance is <br /> complete (page 8, Footnote 4). This is also explained in a note on the Exhibit-F <br /> map. <br /> 42) The Division recommends adjusting the scale on this map. The current version <br /> includes considerable area that is beyond the permit boundary. <br /> Raptor Materials First Adequacy Response <br /> It was shown at a smaller scale to show the effect on the landform ecology of the <br /> area. A revised 1 inch = 200 scale map with legend is provided. <br /> Division Second Adequacy Comment <br /> No additional response is required from RM. <br /> 6.4.7 Exhibit G - Water Information <br /> 43) On Page 1 of Exhibit G, the text states that the site will drain internally. Please <br /> add a statement that the site will be operated to prevent any significant runoff from <br /> disturbed areas from flowing offsite. Also state that the site will be operated to <br /> 441Page <br /> Correspondence to the Colorado Office of Mined Land Reclamation —Reply to Rob Zuber,EPS—Adequacy Letters of 24 June and 5 <br /> August 2022;in the matter of the Two Rivers Sand,Gravel and Reservoir Project—M2022-013. <br />