My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-02-02_PERMIT FILE - M2022013 (12)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022013
>
2023-02-02_PERMIT FILE - M2022013 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 3:57:19 PM
Creation date
2/2/2023 3:31:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022013
IBM Index Class Name
Permit File
Doc Date
2/2/2023
Doc Name Note
Cover Letter
Doc Name
Adequacy Review Response #2
From
Raptor Materials LLC
To
DRMS
Email Name
RDZ
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lining of basins involves the placement of low permeability compactable fill, from <br /> on-site or other suitably- sourced geologic materials, into the keyway-; the same <br /> key- \-ay-used to facilitate discharge to keep the basins dry- and free of <br /> groundwaters at the time of extraction. The balance of the basin floors and <br /> slopes are also covered and compacted with the same materials until it meets the <br /> standards established under the August 1999 State Engineer Guidelines for Lining <br /> VARRA COMPANIES, INC. TWO RIVERS SAND GRAVEL AND RESERVOIR PROJECT MARCH 2O22 <br /> A REGULAR IMPACT(1121 CONSTRUCTION PERMIT APPLICATION-COLORADO DIVISION OF RECLAMATION WING&SAFETY <br /> OFFICE OF MINED LAND RECLAMATION <br /> Page � 5 <br /> 6.4.5 EXHIBIT E - Reclamation Plan <br /> Criteria. Typical to obtaining approval for the constructed liner, the lined basin <br /> must pass a 90-day- leak test. Correspondence from the OSE approving the <br /> construction of the lined basin idll be submitted to the ONILR on receipt; or as <br /> part of any request for release of the permit, in part or whole. <br /> Essentially-, the pushed parent rock material will form the minimum 3h:1x* slopes <br /> of the basin and be compacted to a permeability- of 10-6; forming a lined basin that <br /> complies with Colorado Water Lana and Guidelines mentioned, above. In this <br /> manner, the lined basins Ntizll maintain a required separation and accounting of <br /> stored water from the underlying ground waters. ENzdence of compliance with <br /> the rules and regulations of the Colorado Dixision of Water Resources will be <br /> prodded to the OMLR on completion of the lined basins. <br /> Division Second Adequacy Comment <br /> RMmust update Exhibit E to remove ambiguity in the plan in general, and in <br /> particular in comparison to the application form. <br /> Raptor Materials Second Adequacy Response <br /> The application has been revised as requested with wording revised or removed <br /> completely in various revised Exhibits to remove ambiguity and provide clarity that <br /> the reclamation plan and proposed post mining land use is lined water storage. <br /> 29) The reclamation plan requires more detail. In particular, the plan should include <br /> 361Page <br /> Correspondence to the Colorado Office of Mined Land Reclamation —Reply to Rob Zuber,EPS—Adequacy Letters of 24 June and 5 <br /> August 2022;in the matter of the Two Rivers Sand,Gravel and Reservoir Project—M2022-013. <br />
The URL can be used to link to this page
Your browser does not support the video tag.