Laserfiche WebLink
RECLAMATION PLAN EXHIBIT D <br /> We plan to reclaim the topsoil for the gravel pit once we are finished mining all of the gravel. <br /> Reclamation is expected to be complete by December 31, 2023.We will start replacing topsoil once we <br /> are finished mining all of the gravel.The maximum slopes of the reclaimed slopes will be 4:1.In order to <br /> revegetate the gravel pit we will de-compact the site and drill seed with the landowner's recommended <br /> natural blend. Our estimated reclamation cost is$45,000for contouring and top soiling. Seeding will be <br /> an additional$5,000. <br />