Laserfiche WebLink
MINING PLAN EXHIBIT C <br /> The estimated date that the mining will commence will be April 1st,2023 and will be complete <br /> on December 31st,2023.The estimated depth of soil that will be salvaged for use in the reclamation <br /> process will be 6-12". We anticipate that there will be no overburden to reach the gravel.We anticipate <br /> that we will be mining an average of 15'of gravel.The only major component for the pit will be access <br /> road leading into the pit.There will be no offices,buildings, or facilities at the location of the pit. We will <br /> reclaim the pit once we are done mining the gravel.The only road improvements necessarywill be to <br /> the access road between the county road and the gravel pit. For the access road we will remove 6-12" <br /> topsoil and replace and compact with gravel.We will be using minimal waterfor dust control during the <br /> operation of the gravel pit.Our water source will be from the city of Flagler CO.The primary and only <br /> commodity that we will be mining will be gravel which will be used on the turbine site string roads. <br /> There will be no explosives used in conjunction with the mining operation. <br />