Laserfiche WebLink
George and Jennifer Quist 2 <br /> o Site B — A rectangular area approximately 200ft x ION (20,OOOft2 or 0.5 acres). <br /> This maximum area of disturbance includes room for tailings and topsoil storage. <br /> This site will be accessible from the non-system access road. This site will be <br /> accessed via the main access route approximately 1 Oft x 4,752ft (47,520ft2 or 1.1 <br /> acres). <br /> o Approximately 5 acres of disturbance, including all excavations, stockpiles, and <br /> access. <br /> o If no pegmatite is found in the next 2-5 years,the two sites will be reclaimed, and <br /> operations will move to the unpatented mining claims of Hilltop, Silver <br /> microcline, Sugar Loaf, and Suzie Blue. A modification will be submitted for <br /> future disturbance on the Hilltop, Silver microcline, Sugar Loaf, and Suzie Blue. <br /> • Only small aspens and shrubs will be cleared for operations at this site, no mature timber <br /> will be cleared during prospecting and mining activities. <br /> • Recontouring and seeding of disturbed areas will be conducted as part of annual <br /> reclamation and close-out. Reclamation will include backfilling prospect pits that show <br /> no potential for further development, recontouring the surface, replacing topsoil, and <br /> seeding. Seeding will take place at the conclusion of each season using a mixture <br /> approved by the USFS. <br /> • Use of mechanized equipment (Case 580 SK or John Deere 690 series track hoe, or <br /> equivalent) to excavate two dig sites (disturbance described above). This equipment will <br /> remain onsite for the duration of the season and will be used for a maximum of sixty (60) <br /> 8-hour days(averaging 30 days/year) from June 1 to August 1 of each operating season. <br /> • Use of other equipment possibly including hand tools (i.e., picks, shovels, pry bars, <br /> sledgehammers, etc.), impact hammers (electrically, battery, or air operated), and <br /> possibly a generator and/or portable air compressor. All hand tools will be removed from <br /> site daily. <br /> • A 2-3-person crew will commute to the site daily with no onsite camping planned. The <br /> only structure proposed is a portable toilet from which waste will be removed and <br /> transported to a waste management facility at the end of each workday. <br /> • Each site will be completely reclaimed at the end of 5 years, unless findings warrant <br /> further exploration, in which case a revised plan of operations will be filed preceding <br /> further operations. <br /> Based on my initial review of your MPO, additional information will be required in accordance <br /> with 36 CFR 228.4(c), as well as an environmental (NEPA) analysis. After the South Park <br /> Ranger District has completed the review of your MPO, I will provide you, in writing, a list of <br /> additional items necessary for you to submit in order to consider your plan complete. <br />