Laserfiche WebLink
From: Kristy Weyerman<Kristy.Weyerman@pdce.com> <br /> Sent:Thursday, November 17, 2022 8:39 AM <br /> To:JC York<icyork@i-tconsulting.com> <br /> Cc:Chris Leone<chrisleone@42contracting.com>;Todd Yee<toddyee@i-tconsulting.com> <br /> Subject: RE: [EXTERNAL] :Structure Agreement for PDC Tank Battery and Gas Line- Near CR 40 on North Side across <br /> from Cureton Gas Plant <br /> Hey JC, <br /> What is your timeframe to start the mining operations? <br /> [WNERGY <br /> Kristy Weyerman I Surface Landman—DJ Assets I PDC Energy, Inc 0: 970-506-9272 x5920 <br /> C: 970-373-6323 1 Kristy.Weyerman@pdce.com <br /> From:JC York<icyork@i-tconsulting.com> <br /> Sent: Friday, November 11, 2022 11:34 AM <br /> To: Kristy Weyerman<Kristy.Weyerman@pdce.com> <br /> Cc:Chris Leone<chrisleone@i2contracting.com>;Todd Yee<toddyee@i-tconsulting.com> <br /> Subject: [EXTERNAL] :Structure Agreement for PDC Tank Battery and Gas Line-Near CR 40 on North Side across from <br /> Cureton Gas Plant <br /> Kristy— <br /> Per our phone conversation attached is the structure agreement along with our mining plan map and our slope stability <br /> analysis.As discussed the Division of Reclamation Mining and Safety requires that we try to get a structure agreement <br /> with structure owners within 200 feet of the mine permit boundary. We have to have a factor of safety of 1.5 or greater <br /> for the DRMS to accept the static analysis and a factor of safety of 1.3 or greater for the pseudo-static(earthquake <br /> loading)and based on the analysis we have a factor of safety of 2.79 and 2.05 for the static and pseudo-static loading. <br /> Regards, <br /> J.C. <br /> J.C. York, P.E. <br /> J&T Consulting,Inc. <br /> 305 Denver Avenue, Suite D <br /> Fort Lupton, CO 80621 <br /> Office: (303) 857-6222 <br /> Mobile: (970)222-9530 <br /> FAX: (303) 857-6224 <br /> 2 <br />