Laserfiche WebLink
RECEIVED <br /> ,4",10 0 <br /> J&T Consulting, Inc. <br /> JAN 2 5 2023 <br /> DIVISION OF RECLAMATION <br /> January 20, 2023 MINING AND SAFETY <br /> Mr. Peter Hays <br /> Environmental Protection Specialist <br /> Physical Address: <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> Mailing Address: <br /> Division of Reclamation, Mining and Safety, Room 215 <br /> 1001 East 62nd Avenue <br /> Denver, CO 80216 <br /> RE: J-2 Contracting Company. — Hunt Irrigation Pond, File No. M-2022-050, Special Operation <br /> 111(1)(b) Reclamation Permit Application Adequacy Review Letter Response <br /> Dear Mr. Hays, <br /> J-2 Contracting Company (J-2) has received the Division's Adequacy Review of the Special <br /> Operation 111(1)(b) Reclamation permit Application letter dated January 18, 2023. Below <br /> are the comments and the corresponding responses that we have provided to address the <br /> adequacy review comments. <br /> Exhibit B Site Description (Rule 6.3.2) <br /> 1. During a pre-operations inspection, the Division observed blue-capped monuments near the <br /> Cureton Gilcrest, LLC gas line. This item was discussed in the pre-operational inspection <br /> report from November 28, 2022. No additional response is required by the applicant. <br /> Response: Acknowledged. <br /> 2. In Exhibit C, the applicant states that mining will not affect groundwater. For Exhibit B, Rule <br /> 6.3.2(c) requires a statement regarding water table elevations when available. In Exhibit C, <br /> the applicant states that the depth to groundwater is estimated from reaching groundwater <br /> during excavation of exploratory tests pits at the site. Please include a statement in Exhibit B <br /> about the known water table elevations from available data. <br /> Response: A statement has been provided in number (7) of Exhibit B along with <br /> additional information for a monitor well on the east side of the site where <br /> groundwater measurements have been recorded and will continue to be monitored <br /> during mining. <br /> Exhibit C— Mining Plan (Rule 6.3.3) <br /> 3. In Exhibit C, the applicant states that stockpiled topsoil will be stabilized through <br /> roughening to prevent erosion. Rule 6.3.3(b) requires topsoil that will be stockpiled to <br /> be stabilized with a vegetative cover or other means until used in reclamation. Please <br /> commit to seeding the topsoil pile if it is stockpiled longer than 180 days without being <br /> used for reclamation. <br /> Response: J2 Contracting Co. (the applicant/operator) commits to seeding the <br /> topsoil pile if it is stockpiled longer than 180 days without being used for <br /> reclamation. <br /> V M 305 Denver Avenue—Suite D•Fort Lupton CO 80621 •Ph: 303-857-6222 <br />