My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-10-28_GENERAL DOCUMENTS - M2007048
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M2007048
>
2022-10-28_GENERAL DOCUMENTS - M2007048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2023 6:51:51 AM
Creation date
1/12/2023 10:34:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007048
IBM Index Class Name
General Documents
Doc Date
10/28/2022
Doc Name Note
Indian Shadows Mine
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Measurement and Payment <br /> Measurement for payment for this ITEM will be measured to the nearest cubic yard of <br /> topsoil imported and placed on site. Payment for this ITEM will be paid for at prices <br /> established in ITEM 4.0 of the Bid Schedule per cubic yard of topsoil placed on the site. <br /> Such payment shall be considered full compensation for all labor, materials, equipment <br /> and all other items necessary and incidental to the placing of cover materials on the <br /> repository, as directed and described in the specifications. Payment will be as this ITEM <br /> is completed and approved by the PROJECT MANAGER. <br /> ITEM 5.0 Revegetation <br /> Following application of topsoil, the area will hydro seeded with a native seed mix. The <br /> estimated total area to be hydro-seeded is two acres (2.0 ac.). Seed will be provided by <br /> PROJECT MANAGER. CONTRACTOR will supply the labor and equipment necessary <br /> for completion of this ITEM in accordance with Section 20.0, of the General Bid <br /> Specifications 2009. Mulch is required. Fertilizer is NOT required. <br /> Measurement and Payment <br /> Measurement for this ITEM will be made at the unit prices established in ITEM 5.0 of <br /> the Bid Schedule. Measurement for payment will be made to the nearest 0.1 acre. The <br /> price bid for selective weed spray will cover all costs for completing the activities <br /> required under this ITEM. Payment will be approved by the PROJECT MANAGER upon <br /> completion of this ITEM. Such payment will be considered full compensation for all <br /> labor, materials, equipment, and all other items necessary and incidental to the <br /> completion of this bid item. <br /> PROJECT OBSERVATION <br /> The PROJECT MANAGER will be at the project site periodically to monitor construction <br /> activities and ensure that each work item is completed and constructed to design <br /> specifications. The PROJECT MANAGER will be available during regular business hours <br /> (8:00 A.M. to 5:00 P.M.) on weekdays. Inspections will not be scheduled on weekend days <br /> or holidays without prior approval of the PROJECT MANAGER. It is the CONTRACTOR'S <br /> responsibility to schedule inspections with the PROJECT MANAGER so as not to delay the <br /> work. The following items must be observed and approved by the PROJECT MANAGER <br /> before proceeding with additional work: <br /> 1. Topsoil application prior to seeding. <br /> The attached Bid Schedule form must be submitted. Award will be made to the apparent <br /> low bidder if the low quote is within the project budget estimate, and if the CONTRACTOR'S <br /> equipment and proposed schedule are deemed sufficient by the Division to accomplish the <br /> project within the specified time of completion. <br /> Page 10 of 10 <br /> Rev.7/15/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.