10 January 2023 <br /> C-1981-010/Trapper Mine RAR <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> Y - Air Resource Protection R - Roads <br /> N- Availability of Records R -Reclamation Success <br /> R -Backfill & Grading Y -Revegetation <br /> NA -Excess Spoil and Dev. Waste Y - Subsidence <br /> R-Explosives Y - Slides and Other Damage <br /> R -Fish& Wildlife Y - Support Facilities On-site <br /> R -Hydrologic Balance N - Signs and Markers <br /> R - Gen. Compliance With Mine Plan NA - Support Facilities Not On-site <br /> NA - Other NA - Special Categories Of Mining <br /> NA -Processing Waste Y- Topsoil <br /> COMMENTS <br /> This was a partial inspection of the Trapper Mine; permit C 1981010, operated by Trapper Mining Inc. <br /> The inspection was conducted and the report and photos prepared by me, Robin Reilley of the DRMS. <br /> Graham Roberts,Trapper Mine representative was present throughout the inspection. Skies were cloudy. <br /> Temperatures hovered around 40 degrees Fahrenheit. The air was humid and a stiff wind was blowing. <br /> Snow was melting rapidly due to temperatures and chinook wind/atmospheric river weather conditions. <br /> PERMITTING ACTIONS in PROGRESS: <br /> o Permit Revision 11 (PRII) <br /> o A TR is under consideration for dragline mining up to the lease limit in L Pit. <br /> OUTSTANDING MAINTENANCE <br /> INSPECTION <br /> GENERAL MINE PLAN COMPLIANCE: <br /> Activities in the L,N and I and J Pits were observed and appear to be progressing as permitted. The drag <br /> line was operating casting spoil at the south end of L Pit. In the N pit Q seam has been mined, openings <br /> backfilled and the floor will be raised by backfilling to mine M seam above. Significant water was <br /> running in the N Pit. Coal was stockpiled for hauling. <br /> Two blasts were set up in I Pit east. I pit extension is dug. <br /> J Pit is getting dug excavators we're present in the pit <br /> ROADS—Rule 4.03 <br /> Construction 4.03.1(3)14.03.2(3); Drainage 4.03.1(4)14.03.2(4); Surfacing and Maintenance 4.03.1(5) <br /> and(6)14.03.2(5) and(6); Reclamation 4.03.1(7)14.03.2(7) <br /> o Main haul roads were in good repair and well maintained at the time of inspection. Roads were <br /> wet and muddy due to melting snow and warm temperatures. <br /> o Access roads were inaccessible throughout the site due to snow. <br /> o Ditches appeared to be functioning adequately. <br /> HYDROLOGIC BALANCE Rule 4.05 <br /> Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, <br /> 4.05.10; Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Drainage-Acid <br /> and Toxic Materials 4.05.8;Impoundments 4.05.6,4.05.9; Stream Buffer Zones 4.05.18 <br /> Number of Partial Inspection this Fiscal Year: 5 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 2 of 9 <br />