My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-01-09_REVISION - M2021052 (23)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2021052
>
2023-01-09_REVISION - M2021052 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2023 8:55:41 PM
Creation date
1/11/2023 2:24:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021052
IBM Index Class Name
Revision
Doc Date
1/9/2023
Doc Name Note
Exhibit D - Mining Plan
Doc Name
Adequacy Review Response
From
IHC Scott
To
DRMS
Type & Sequence
AM1
Email Name
CCW
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rifle Gravel Pit tp Jaif!.Jci(y 2023' <br /> Table 2. Estimated Timetable for Phases 1-4 Activities <br /> Phase/Stage Estimated Estimated Type of Overburden <br /> Duration Depth <br /> Phase 1 Approx. 0.5 Clay and silt; about 6"to 1-foot of topsoil, medium <br /> Site Development 1-2 months feet to 1 foot stiff, slightly moist, brown <br /> &Grading <br /> Phase 2 2-6 months N/A No additional overburden will be removed during <br /> Mining Preparation this phase. <br /> Phase 3 3- 5 years 17—21 feet Varies <br /> Mining Extraction <br /> 21 feet See Boring 4 Remove estimated 6"of clay and <br /> 30% 1 — 1.5 years (gravel layer silt; gravel layer estimated at 1 foot to 22 feet <br /> thickness) below surface. <br /> 21 feet See Boring 3. Remove estimated 5.5 feet to 6 feet <br /> 60% 1 — 1.5 years (gravel layer of clay and silt overburden; gravel layer estimated <br /> thickness) at 7 feet to 27 feet below surface. <br /> 21 feet See Boring 3. Remove estimated 5.5 feet to 6 feet <br /> 100% 1 — 1.5 years (gravel layer of clay and silt overburden; gravel layer estimated <br /> thickness) at 7 feet to 27 feet below surface. <br /> Phase 4 <br /> (Final 6 months NA NA <br /> Reclamation) <br /> 'The depths and thicknesses are estimated and based upon the nearest exploratory boring logs included in Attachment C. <br /> 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.