My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-01-09_REVISION - M2021052 (23)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2021052
>
2023-01-09_REVISION - M2021052 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2023 8:55:41 PM
Creation date
1/11/2023 2:24:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021052
IBM Index Class Name
Revision
Doc Date
1/9/2023
Doc Name Note
Exhibit D - Mining Plan
Doc Name
Adequacy Review Response
From
IHC Scott
To
DRMS
Type & Sequence
AM1
Email Name
CCW
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rifle Gravel } f # I January Z52 <br /> reclamation effort follows Garfield County LUC standards (LUC Section 7-1002.H). Formal <br /> wetland mitigation per USACE standards is not required, as no impacts to wetlands are <br /> proposed. <br /> See Section 6 for additional information regarding reclamation of the property. <br /> 5.3 Mining Timetable <br /> At this time, the proposed mine would operate daily, with excavation and processing <br /> occurring 8 months of the year(roughly April — November). Total recoverable volume is <br /> estimated at approximately 292,810 CY of aggregate, which is expected to support <br /> operations for between three and five years. <br /> The estimated schedule for preparing, mining, and reclaiming this site is as follows: <br /> • March 2023—start of site prep (LDA staking, overburden removal, and berm <br /> construction) <br /> • April 2023 —start of mining operations and concurrent reclamation as mining <br /> progresses <br /> • December 2026 to 2028—end of mining operations and reclamation (life of mine <br /> estimated at 3-5 years) <br /> Table 2 provides a range of the duration of mining by phase/stage, estimated nature, depth <br /> and thickness of the deposit to be mined and type of overburden to be removed. <br /> Attachment C includes the exploratory boring logs and material information. <br /> 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.