Laserfiche WebLink
the Colowyo Mine. <br /> TR-126 TR-126 provided the as-built designs for the Collom Ponds into the Colowyo <br /> PAP. <br /> TR-127 TR-127 provided a redesign for the West Pond Access Road by shifting the <br /> horizontal alignment of the access road to the east. <br /> TR-128 TR-128 upgraded the existing road (pre-mining road) up Taylor Creek from Haul <br /> Road A to the East Taylor Pond. <br /> TR-129 TR-129 relinquished the quarterly monitoring requirements for the West Pit Fill. <br /> TR-130 TR-130 incorporated a small area exemption in the upper reaches of the Gulch A <br /> watershed. <br /> TR-131 TR-131 provided updates to the Section 28 watershed, disturbance boundary, and <br /> secondary channels for future reclamation areas adjacent to the South Taylor Pit. <br /> TR-132 TR-132 updated the surface hydrology model for the Section 16 Pond watershed <br /> to appropriately delineate the sub-watersheds including Phase III released lands. <br /> TR-133 TR-133 provided road as-built configurations for the Collom Haul Road, Haul <br /> Road A, and the Jubb Creek Access Road. <br /> TR-134 TR-134 incorporated highwall mining in the Collom Pit box cut. <br /> TR-135 TR-135 approved a reduction in Colowyo's permit boundary to remove Phase III <br /> release lands and structures. <br /> TR-136 TR-136 incorporated pipe spillways (in addition to already constructed <br /> emergency spillways) to EP1 and EP2 stock ponds, reduced the overall <br /> contributing watershed to Prospect Pond by approximately 7 acres, and added <br /> riprap lining to the D2 Ditch. <br /> TR-137 TR-137 approved the removal of the gate valve on the Stoker Siding Pond. <br /> TR-138 TR-138 approved the removal of the primary discharge structures on the Gossard <br /> and Rail Loop Ponds, and provides a hydrology demonstration that both ponds <br /> will be full containment structures. <br /> TR-139 TR-139 approved the removal of the gate valve on the primary discharge structure <br /> on the Section 25 Pond. <br /> Proposed Decision and Findings of Compliance January 5,2023 <br /> Permit Renewal No. 8 Page 19 <br />