My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-01-05_REVISION - C1981019 (14)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2023-01-05_REVISION - C1981019 (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2023 9:17:47 AM
Creation date
1/9/2023 8:19:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
1/5/2023
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Tri-State Generation and Transmission Association
Type & Sequence
RN8
Email Name
ZTT
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sites that were discovered during operations in 2018 for the Collom expansion. <br /> MR-198 MR-198 incorporated flumes below the sumps on Taylor Creek so Colowyo can <br /> comply with permit conditions as dictated by their Industrial Waste Water Permit. <br /> MR-199 MR-199 incorporated staff gauges in the Section 36, Middle, Section 25, and <br /> Section 26 sediment ponds. <br /> MR-200 MR-200 approved the Gulch A Pond and East Side Collection Ditch to remain as <br /> permanent structures post-mine. <br /> MR-201 MR-201 updated Volume 1, Section 4.12 with documentation of the surface <br /> landowner replacing a culvert on the Taylor Creek access road. <br /> MR-202 MR-202 updated the cumulative bond schedule presented in Exhibit 13C with <br /> clean water diversion CWD-l. <br /> MR-203 MR-203 updated the cumulative bond schedule with two additional culverts for <br /> the Collom facilities pad, and proposes a potable water well location to support <br /> the Collom operation. <br /> MR-204 MR-204 updated Map 23B to delineate the Collom mining limits, specifically <br /> showing the pit crest location. <br /> MR-205 MR-205 updated Exhibit 13C and Map 13C-1 with additional topsoil removal <br /> area for the temporary spoil pile to support continued mining operations into <br /> 2020. <br /> MR-206 MR-206 updated Exhibit 3 with a new certificate of liability insurance and <br /> Exhibit 1B from the Colorado State Land Board allowing Colowyo to upgrade a <br /> two-track road on Phase III release reclamation areas to support maintenance of a <br /> primary sediment controls structure. <br /> MR-207 MR-207 updated Map 28 - Topsoil Handling with revised topsoil movements to <br /> ensure proper topsoil application volumes can occur in the 2019 reclamation <br /> block. <br /> MR-208 MR-208 incorporated a 0.2 acre increase in the disturbance boundary just north of <br /> the Stoker Siding Pond to conduct maintenance activates on the Stoker Siding <br /> Pond. <br /> MR-209 MR-209 incorporated an increase to the disturbance boundary adjacent to the <br /> topsoil pile 15H to accommodate removal of the entire topsoil stockpile. <br /> Proposed Decision and Findings of Compliance January 5,2023 <br /> Permit Renewal No. 8 Page 112 <br />
The URL can be used to link to this page
Your browser does not support the video tag.