My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-01-05_REVISION - C1981019 (14)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2023-01-05_REVISION - C1981019 (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2023 9:17:47 AM
Creation date
1/9/2023 8:19:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
1/5/2023
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Tri-State Generation and Transmission Association
Type & Sequence
RN8
Email Name
ZTT
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TR-155 TR-155 incorporated two sediment ponds, the Upper and Lower Section 3 Ponds <br /> respectively, which are proposed to be within Streeter Ditch directly below the <br /> primary crushing facility at Colowyo. <br /> TR-156 TR-156 incorporated a geotechnical report addendum (Exhibit 23, Item 4)into the <br /> permit to address the requirement from Exhibit 23, Item 1 (Figure 4), for a <br /> geotextile fabric to be placed over the underdrain in the Little Collom Gulch <br /> Valley Fill. <br /> TR-157 TR-157 proposes to reduce Colowyo's reclamation liability. This revision is <br /> currently under the Division's review. <br /> TR-158 TR-158 proposes additional sediment control measures for the Final East Pit <br /> Ditch watershed. This revision is currently under the Division's review. <br /> 3.4 Status of Minor Revisions <br /> This section identifies Minor Revisions (MR) processed since the issuance of Permit Renewal <br /> No. 7 (RN-07) on August 14, 2018. <br /> MR-191 MR-191 incorporated Colorado Discharge Permit No. CO0045161 into the <br /> Colowyo PAP which satisfied Stipulation 23. <br /> MR-192 MR-192 incorporated supplemental lighting at critical points along the Collom <br /> Haul Road to improve wildlife visibility and to minimize wildlife/vehicle <br /> collisions. <br /> MR-193 MR-193 documented an approximately 22-acre wildland fire that occurred on the <br /> ridge line between Wilson and Taylor Creeks, within the permit boundary, on <br /> September 9, 2018. <br /> MR-194 MR-194 updated Map 1 and Exhibit 1 with revised surface ownership adjacent to <br /> the permit boundary. <br /> MR-195 MR-195 incorporated geotechnical drill holes on the Collom facilities pad to <br /> support final design of the buildings that will be constructed on the Collom <br /> facilities pad. <br /> MR-196 MR-196 updated Section 2.04.13 in Volume 1 to remove inclusion of the <br /> quarterly valley fill inspection reports in the annual reclamation report. <br /> MR-197 MR-197 incorporated Exhibit 5 Item 11 to the permit document. Exhibit 5 Item <br /> 11 contains the final cultural resources discovery report for the cultural resource <br /> Proposed Decision and Findings of Compliance January 5,2023 <br /> Permit Renewal No. 8 Page III <br />
The URL can be used to link to this page
Your browser does not support the video tag.