My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-01-04_PERMIT FILE - M2022013 (22)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022013
>
2023-01-04_PERMIT FILE - M2022013 (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2023 8:50:39 PM
Creation date
1/4/2023 8:19:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022013
IBM Index Class Name
Permit File
Doc Date
1/4/2023
Doc Name Note
Exhibit G - CDPHE Discharge Permit COG502213
Doc Name
Adequacy Review Response #2
From
Raptor Materials, LLC
To
DRMS
Email Name
RDZ
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART <br /> Page 11 of 67 <br /> Permit No.: COG500000 <br /> a. Dimension Stone facilities(SIC code 1411) <br /> Table C.1.1—Applicable Limitations <br /> Limitations Monitoring Frequency <br /> ICIS Code Parameter 30 day 7 day Daily 2 year Sample Type <br /> average average Max. average Minor Facilities Major Facilities <br /> General Permit Requirements <br /> Monthly 2x/month <br /> Limit in Recorder or <br /> 50050 Flow, MGD1 ---- Report ---- (Continuous or (Continuous or <br /> cert. Instantaneous 2) InstantaneousZ) In-situ <br /> 00400 pH,s.u. ---- ---- 6.5-9.0 ---- 2x/month Weekly Grab <br /> 84066 Oil and Grease, mg/I ---- ---- ---- I ---- 2x/month Weekly Visual3 <br /> 03582 Oil and Grease, mg/I ---- ---- 10 ---- Contingent Weekly Grab <br /> 00530 Total Suspended 30 45 ---- ---- 2x/month Weekly Grab <br /> Solids, mg/I <br /> Site Specific Requirements <br /> 515001 Flow,Total, MG' Report ---- ---- ---- Continuous or Continuous or Calculated <br /> Quarterly InstantaneousZ InstantaneousZ <br /> Total <br /> 51500 EG Flow,Total, MG4 Report ---- ---- ---- Continuous or Continuous or Calculated <br /> Monthly InstantaneousZ InstantaneousZ <br /> Total <br /> 70295 Total Dissolved Solids, Report ---- ---- ---- Quarterly Quarterly Grab <br /> mg/ls <br /> 00665 Total Phosphorus(as <br /> P), mg/16 Various Various Various ---- Various Various Composite <br /> 00665 Total Phosphorus(as <br /> Various ---- ---- ---- Various Various Calculated <br /> P), lb/month' <br /> 00665 Total Phosphorous, <br /> cumulative <br /> Ibs/previous 12 Various ---- ---- ---- Various Various Calculated <br /> consecutive months <br /> 01323 Selenium, Potentially <br /> Various ---- Various Various 2x/month Weekly Grab <br /> Dissolved, µg/I <br /> 01323 Selenium, Potentially Various Various ---- 2x/month Weekly Calculated <br /> Dissolved, Ibs/day' <br /> 00094 Electrical Conductivity Various ---- ---- ---- Quarterly Quarterly Grab <br /> (EC),dS/m <br /> Various Other Pollutants of Grab or <br /> Various ---- Various Various Various Various <br /> Concern Composite <br /> Various Whole Effluent Toxicity(WET) <br /> 3 <br /> Chronic Stat Diff and IC25>_IWC ---- Composites/ <br /> Quarterly Quarterly Test <br /> Acute LC50>100% ---- Grab <br /> Note 1: Flow Limit—The chronic flow limit is equal to the flow rate provided in the permit application,and will be stated in the <br /> certification. <br /> Note 2: Flow Measurement—If power is not available,flow may be measured on an instantaneous basis. <br /> Note 3: Oil and Grease: — A visual observation of the discharge for each permitted outfall must be made 2 times per <br /> month or weekly,as stated in the certification. In the event an oil sheen or floating oil is observed, a grab sample shall be <br /> collected weekly, analyzed, and reported on the DMR. In addition, corrective action shall be taken immediately to <br /> mitigate the discharge of oil. <br />
The URL can be used to link to this page
Your browser does not support the video tag.