Laserfiche WebLink
Raptor Materials First Adequacy Response <br /> Exhibit A has been updated to reflect the correction, as attached. <br /> Division Second Adequacy Comment <br /> No additional response is required from RM. <br /> 8) It appears that the coordinates for the Central Field SW Entrance are incorrect. <br /> Please check them and revise the Exhibit A text as necessary. (The coordinates <br /> listed for this entrance appear to be near the Varra Coulson Project.) <br /> Raptor Materials First Adequacy Response <br /> Three locations were corrected as reflected in the revised Exhibit A, and verified <br /> via supporting Snippets of the coordinates captured from Google Maps, which <br /> follow, below: <br /> SouthWest Entrance: <br /> 396 <br /> 0 <br /> adEvans X <br /> Colorado <br /> 40,341869,-104,783755 <br /> The Homestead (North) Entrance: <br /> Evans X <br /> Colorado <br /> 40.349126,-4414.774905 <br /> The Primary Entrance 48): <br /> 9 Page <br /> Correspondence to the Colorado Office of Mined Land Reclamation—Reply to Rob Aber,EPS—Adequacy Letters of 24 June and 5 <br /> August 2022;in the matter of the Two Rivers Sand,Gravel and Reservoir Project—M2022-013. <br />