My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-01-04_PERMIT FILE - M2022013 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022013
>
2023-01-04_PERMIT FILE - M2022013 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2023 8:47:46 PM
Creation date
1/4/2023 7:42:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022013
IBM Index Class Name
Permit File
Doc Date
1/4/2023
Doc Name Note
Cover Letter
Doc Name
Adequacy Review Response #2
From
Raptor Materials, LLC
To
DRMS
Email Name
RDZ
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14257-14797 Oe Rd M X <br /> Ml%l ,CGOS433 <br /> 13..',G3353 1G:.)Ybf',a <br /> Division Second Adequacy Comment <br /> No additional response is required from RM. <br /> 6.4.3 Exhibit C - Pre-Mining and Mining Plan Maps of Affected Land <br /> 9) The irrigation ditches need to be clearly shown and labeled on the Existing <br /> Conditions Map (Exhibit C-1). <br /> Raptor Materials First Adequacy Response <br /> The Evans Ditch is labelled. The internal irrigation ditches are owned and <br /> controlled by RM, are visibly evident in the aerial image. While these company <br /> owned ditches are predominantly outside the extraction limits, some are inside the <br /> extraction limits and will be lost to extraction, <br /> E.JVU•.,E.r;FATM <br /> - <br /> m ' <br /> Division Second Adequacy Comment <br /> No additional response is required from RM. <br /> 10) Also, per Rule 6.4.3I, the existing vegetation at the site should be shown. <br /> Raptor Materials First Adequacy Response <br /> 10 Page <br /> Correspondence to the Colorado Office of Mined land Reclamation—Reply to Rob Zuber,EPS—Adequacy Letters of 24 June and 5 <br /> August 2022; in the matter of the Two Rivers Sand,Gravel and Reservoir Project—M2022-013. <br />
The URL can be used to link to this page
Your browser does not support the video tag.