Laserfiche WebLink
Management Plan section in revised Exhibit I/J (page 7, Footnote 2). <br /> 6.4.12 Exhibit L — Reclamation Costs <br /> 51) This exhibit should be updated, as necessary, to match any revisions to Exhibits <br /> D and E, per the adequacy items for those sections. This includes details on <br /> structures. <br /> Raptor Materials First Adequacy Response <br /> RM has reviewed Exhibit L and believes it adequately reflects changes to Exhibits <br /> D and E. <br /> Division Second Adequacy Comment <br /> In the context of this second adequacy letter, Exhibit L must be updated to reflect <br /> revisions to Exhibits D and E. <br /> Raptor Materials Second Adequacy acy Response <br /> A substantially revised Exhibit L has been prepared as requested. <br /> 52) The cost estimate should include a task for ripping areas that will be topsoiled <br /> and vegetated. <br /> Raptor Materials First Adequacy Response <br /> An allowance could be made for ripping a percentage of the area assuming it <br /> becomes compacted. <br /> Division Second Adequacy Comment <br /> RM did not address the adequac iv item. RMneeds to revise Exhibit L to include the <br /> ripping task. <br /> Raptor Materials Second Adequacy Response <br /> Raptor has made appropriate allowances for ripping (disking/scarifying) as <br /> requested in revised Exhibit L (page 8, Footnote 3; page 9, Footnote 4). <br /> 53) The Applicant has noted under the Reclamation Plan (page 5) that water shares <br /> will be dedicated to the Division of Water Resources (DWR) to cover the liability <br /> associated with exposing groundwater. Please be aware that the Division no longer <br /> 521 Page <br /> Correspondence to the Colorado Office of Mined Land Reclamation—Reply to Rob Zuber,EPS—Adequacy Letters of 24 June and 5 <br /> August 2022; in the matter of the Two Rivers Sand,Gravel and Reservoir Project—M2022-013. <br />