Laserfiche WebLink
A water quality monitoring;plan is required for this permit. Please develop that and <br /> include in the revised Evhibit G. <br /> Raptor Materials Second Adequacy Response <br /> A Groundwater Monitoring Plan has been prepared by consultant AWES and is <br /> provided as an additional addendum to Exhibit G (page 4, Footnote 8). <br /> 47) Change "NPDES" to "CDPS" to reflect the requirements of the Water Quality <br /> Control Commission. <br /> Raptor Materials First Adequacy Response <br /> Acknowledged and noted that our only reference to NPDES was simply <br /> incorporating text directly from the rules. Please see Prologue. <br /> Division Second Adequacy Comment <br /> No additional response is required from Rill <br /> Exh H - Wildlife <br /> 48) Indicate which recommendations on wildlife protection in "Threatened and <br /> Endangered Species Habitat Assessment, Two Rivers Parcels" (ERO, 2022) will be <br /> implemented at the site. This report was submitted with Exhibit H of your <br /> application. <br /> Raptor Materials First Adequacy Response <br /> Please see response item "Issue - Wildlife Protection Recommendations" prepared <br /> by ERO dated August 26, 2022 attached as an addendum to Exhibit H. <br /> Division Second Adequacy Comment <br /> No additional response is required from RM. <br /> Exhibits I/J <br /> 49) This exhibit should include a discussion on wetlands in the project area, <br /> including the wash pond and material processing areas. Please state that <br /> operations will be conducted to minimize impacts on wetlands or state that no <br /> operations will be conducted in wetland areas. <br /> Raptor Materials First Adequacy Response <br /> 501Page <br /> Correspondence to the Colorado Office of Mined Land Reclamation—Reply to Rob Zuber,EPS—Adequacy Letters of 24 June and 5 <br /> August 2022;in the matter of the Two Rivers Sand,Gravel and Reservoir Project—M2022-013. <br />