My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-01-04_PERMIT FILE - M2022013 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022013
>
2023-01-04_PERMIT FILE - M2022013 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2023 8:47:46 PM
Creation date
1/4/2023 7:42:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022013
IBM Index Class Name
Permit File
Doc Date
1/4/2023
Doc Name Note
Cover Letter
Doc Name
Adequacy Review Response #2
From
Raptor Materials, LLC
To
DRMS
Email Name
RDZ
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Raptor Materials First Adequacy Response <br /> There is no reference we can identify on p16 to stockpiles, at least not explicitly. <br /> There is discussion of backfilling cut slopes and topsoiling above water line. <br /> Nonetheless items 20, 23 and 32 all broadly relate to topsoil and need to be read <br /> together via a consolidated response to comment 20. <br /> Division Second Adequacy Comment <br /> It appears that the extensive discussion on soils does not include any information <br /> regarding the quantities of soil in stockpiles or the location of soil piles. This <br /> information is required for a detailed reclamation cost estimate and needs to be <br /> added to the Extraction Plan, Exhibit D. <br /> Raptor Materials Second Adequacy Response <br /> The information requested has been included in revised Exhibit D (p 14, Footnote <br /> 2). <br /> 24) In the section Plant Site Development & Operations, text should be added <br /> regarding the details of structures that will be built, including the conveyor. <br /> Dimensions and other details should be provided to aid in the estimate of demolition <br /> costs for these structures. <br /> Raptor Materials First Adequacy Response <br /> Equipment to be used at the plant site is described in the Plant Site Development <br /> and Operations section on p19 as shown below. Plant site equipment will be semi- <br /> mobile in nature and is not expected to require permanent foundations or footers. <br /> The conveyor will be set on an elevated structure at varying heights to be situated <br /> about the 1 in 100-year flood level. An average height of 7 feet is expected. The <br /> conveyor will be supported by legs at intervals of approximately 20 feet with <br /> concrete blocks used as necessary to anchor the legs. Final conveyor <br /> specifications are to be determined but a 24-36" belt is anticipated. <br /> 311 Page <br /> Correspondence to the Colorado Office of Mined Land Reclamation—Reply to Rob Zuber,EPS—Adequacy Letters of 24 June and 5 <br /> August 2022;in the matter of the Two Rivers Sand,Gravel and Reservoir Project—M2022-013. <br />
The URL can be used to link to this page
Your browser does not support the video tag.