Laserfiche WebLink
The extraction limits assure through the use of setbacks that other interests are <br /> not affected by planned extraction. Extraction is set back uniformly? at a <br /> minimum 10.0± feet from the edge of property lines; easements and rights-of- <br /> way; underground gas Tines or other underground facilities, irrigation ditches <br /> and seep ditch, wells and other structures. Specific variations in the location <br /> of: stockpiles, boundaries of extraction, and related information relative to <br /> adjacent structures and easements; from that represented on Exhibit C-2: <br /> Extraction Plan Map. <br /> Extraction jell not occur closer than 125± �rom the face of a residential <br /> structure; unless there is a x�Titten accommodation i%ith the owner of the <br /> residential structure that allows extraction to occur within a closer stated limit. <br /> Extraction will occur no closer than 25± feet from well heads and related above <br /> ground facilities. Extraction around well heads hill be concurrently-backfilled <br /> to maintain a 100± foot buffer from the balance of extracted lands. At all <br /> VARRA COMPANIES, INC. TWO RIVERS SAND GRAVEL AND RESERVOIR PROJECT MARCH 2022 <br /> A REGULAR IMPACT[1121 CONSTRUCTION PERMIT APPLICATION-COLORADO DWI[SION OF RECLAMATION HANG&SAFETY <br /> OFFICE OF MINED LAND RECLAMATION <br /> Page 115 <br /> 6.4.5 EXHIBIT D - Extraction Plan <br /> Division Second Adequacy Comment <br /> Rill needs to revise Exhibit D to address this Item and re-submit it. <br /> Raptor Materials Second Adequacy Response <br /> The revised Exhibit D has been corrected as requested (p18, Footnote 8). <br /> 23) On page 16, regarding the discussion on topsoil and overburden stockpiles, more <br /> detail is needed regarding the storage volumes and locations of the piles, including <br /> distances from the piles to the areas to be reclaimed. It is recommended that they <br /> be shown on Map C-5. It should also be stated that the piles will be configured to <br /> prevent obstruction of flood waters, namely elongate the piles to make them <br /> parallel to the flow direction. <br /> 301Page <br /> Correspondence to the Colorado Office of Mined Land Reclamation—Reply to Rob Zuber,FPS—Adequacy Letters of 24 June and 5 <br /> August 2022; in the matter of the Two Rivers Sand,Gravel and Reservoir Project—M2022-013. <br />