Laserfiche WebLink
One of the attributes of our Established Extraction Methodology is the use of <br /> flexibility to aid a rapid access to the deposit and completion of the basin. If <br /> needed, four separate extraction teams could be set up in each Section or Field to <br /> speed or adjust the extraction timeline. This has been a feature accepted by the <br /> Office over many submittals and many years. Your own Specialist, Peter Hays, can <br /> attest to this. <br /> The timely application and use of Annual Reports, or Technical Revisions, to <br /> anticipate and adjust attending Financial Warranty to allow the operations to pulse <br /> over time is a humble approach that respects the requirements and objectives of <br /> the Rules and Regulations. The idea is designed to reduce the need for untimely <br /> delays and expensive permit revisions, as well as needless field operation conflicts <br /> that can also jeopardize Compliance with otherwise rigid self-imposed constraints. <br /> The greater beneficial effect is to flexibly match extraction and subsequent <br /> reclamation as operations adjust more naturally to shifts in market demand that <br /> determine the functional life of the mine. This is a projected 35-year life of mine <br /> operation that could be shortened or lengthened by economic influences and other <br /> factors for which we and your Office cannot reliably or genuinely foresee. <br /> This answer will play out for Exhibit L as well, as the entire described Onset Area <br /> is not essentially planned for disturbance, simply the area where initial disturbance <br /> may onset, however, given possible directions NE and SE along an idealized core, <br /> could affect 8-16 acres over the course of the initial 2 years, unless we hit a <br /> depression and it takes 10 years instead. Unlikely as either are, they are <br /> projections in time. The actual areas will be monitored using aerial imagery and <br /> handheld survey instruments to monitor and report the acreages and make <br /> revisions to the Plan and estimated Warranty in response to the current market <br /> drivers of the business. We will then reflect this on related maps and as content <br /> through the annual report process as determined at the time. <br /> Active Resource Recovery: Folloning soil salvage, the balance of the <br /> extractable deposit Kill be removed to the depth of the unconsolidated or <br /> weathered bedrock, transported by conveyor to the plant site pit run, and <br /> subsequently-manipulated as desired by screening, crushing.washing, and <br /> other methods to size and properly dimension the earth product into diverse <br /> merchantable materials for sale. Resource recovery%%ill commence radially- <br /> North and East from a point near the e-Nisting pond and planned first <br /> discharge point shown near the Southern boundary of Central Field- <br /> There are no fixed sequences or phases scheduled as part of the extraction <br /> plan. Instead,Eieltds are used]instead of Phases to describe the activities, since <br /> each field can be accessed concurrently instead of sequentially with the <br /> 18 Page <br /> Correspondence to the Colorado Office of Mined Land Reclamation—Reply to Rob Zuber,EPS—Adequacy Letters of 24 June and 5 <br /> August 2022; in the matter of the Two Rivers Sand,Gravel and Reservoir Project—M2022-013. <br />