Laserfiche WebLink
Technical Revisions (TR) <br /> Submittal Proposed Decision Permitting Action <br /> Date(s) <br /> TR126 21 December 2020 Midterm 8 review response and permit updates. <br /> TR127 14 May 2021 2020 Annual Reclamation Report <br /> TR128 16 September 2021 Mine Pit Updates, Coyote As-Built, text updates. <br /> TR129 30 June 2022 2021 Annual Reclamation Report <br /> TR130 29 July 2022 Updates for I-Pit expansion to west and L Pit expansion <br /> TR131 30 June 2022 No Name Impoundment 92 repair/rebuild. <br /> TR132 10 November 2022 Drag Line Walk Road and Stripping <br /> Permit Revisions (PR) <br /> Submittal Proposed Decision Permitting Action <br /> Date(s) <br /> PR9 8/7/2020 PR9 Five Year Permit Term Mine Plan Update. <br /> PR10 10/12/2020 Mining and reclamation plan for the I and J Pits. <br /> Surety Releases (SL) <br /> Submittal Proposed Decision Released Released Released Reduction in <br /> Date(s) Area Ph I Area Ph II Area Ph III Liability <br /> (acres) (acres) (acres) <br /> SL20 20 May 2020 0.0 0.0 161.2 $162,813.81 <br /> SL21 11 December 2020 298.3 0.0 0.0 $1,796,589.94 <br /> SL22 11 December 2020 0.0 175.0 0.0 $439,038.32 <br /> SL23 19 December 2021 0.0 0.0 265.5 $400,745.80 <br /> Status of Stipulations <br /> The stipulation history for the Trapper Mine was reviewed with this renewal application. The review <br /> included an investigation of any stipulations imposed, and any responses to existing stipulations <br /> received, since the last midterm review. Any stipulations associated with this permit and issued over <br /> the life of this operation which are not discussed in this renewal application have been complied with <br /> or, terminated. <br /> Stipulation No 21 was attached to the permit in conjunction with Permit Renewal No. 6 (approved in <br /> July 2013). Compliance with this Stipulation was met with two technical revision (TR's), TR115, <br /> TR117 and through the midterm review process (MT6). <br /> 4 <br />