My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-12-23_BONDING - C1981010
DRMS
>
Day Forward
>
Bonding
>
Coal
>
C1981010
>
2022-12-23_BONDING - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2022 2:16:47 PM
Creation date
12/23/2022 1:53:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Bonding
Doc Date
12/23/2022
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Trapper Mining Inc
Type & Sequence
PR11
Email Name
RAR
JLE
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 3 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: Load/Haul Section E1,423,800 <br /> Site: Trapper Mine Permit Action: PR11 Permit/Job#: C1981010 <br /> PROJECT IDENTIFICATION <br /> Task#: 00113 State: Colorado Abbreviation: None <br /> Date: 11/22/2022 County: Moffat Filename: CO10-00113 <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: KOMATSU 830E <br /> -Loader: CAT 6090 <br /> Support Equipment-Load Area: NA <br /> -Dump Area: Cat D10T- IOSU <br /> Road Maintenance-Motor Grader: CAT 16M <br /> -Water Truck: Water Tanker, 10,000 Gal. <br /> Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Shovel Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 100 NA 100 50 50 <br /> Ownership cost/hour: $179.05 $23.07 NA $153.67 $163.86 $91.73 <br /> Operating cost/hour: $247.93 $930.15 NA $166.94 $54.93 $65.14 <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own.cost/hour: NA $0.00 NA $0.00 $0.00 $0.00 <br /> Ripper op.cost/hour: NA $0.00 NA $0.00 $0.00 $0.00 <br /> Operator cost/hour: $34.42 $37.32 NA $41.30 $28.56 $21.12 <br /> Unit Subtotals: $461.40 $990.54 NA $361.91 $247.35 $177.99 <br /> Number of Units: 11 1 0 1 1 1 <br /> Group Subtotals: Work: $6,065.94 Support: $361.91 Maint: $425.34 <br /> Total work team cost/hour: $6,853.19 <br /> MATERIAL QUANTITIES <br /> Initial volume: 128,454 CCY Swell factor: 1.000 <br /> Loose volume: 128,454 LCY <br /> Source of estimated volume: Table A-4.1A <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity <br /> Truck Payload(weight)Basis: <br /> Material weight: 3,300 Pounds/LCY <br /> Description: Decomposed rock-75%Rock,25%Earth <br /> Rated Payload: 492,200 Pounds <br /> Payload Capacity: 149.15 LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.