My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-12-23_BONDING - C1981010
DRMS
>
Day Forward
>
Bonding
>
Coal
>
C1981010
>
2022-12-23_BONDING - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2022 2:16:47 PM
Creation date
12/23/2022 1:53:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Bonding
Doc Date
12/23/2022
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Trapper Mining Inc
Type & Sequence
PR11
Email Name
RAR
JLE
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#001 Page 2 of 2 <br /> Job efficiency: 0.790 (3 SHIFTS/DAY) <br /> Spoil pile: 0.900 (SSD-FC) <br /> Push gradient: 1.601 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.929 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.9137 <br /> Adjusted unit production: 1,861.02 LCY/hr <br /> Adjusted fleet production: 3722.04 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 2 Dozer(s) <br /> Unit cost: $0.307/LCY <br /> Total job time: 11.75 Hours <br /> Total job cost: $13,435 <br />
The URL can be used to link to this page
Your browser does not support the video tag.