Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: PRI I Reclamation Cost Estimate <br /> Site: Trapper Mine Permit Action: PR11 Permit/Job#: C1981010 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 5/31/2022 County: Moffat Filename: COIO-000 <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Ash Disposal Pit Regrade(NW section) DOZER 2 11.75 $13,435 <br /> OO113 Load/Haul Section E1,423,800 TRUCKI 1 40.89 $280,245 <br /> 002 Ash Disposal Pit Regrade(Section 1) DOZER 2 25.26 $28,894 <br /> 002B Ash Disposal Pit Regrade(Section 2) DOZER 2 32.20 $36,828 <br /> 003 Ash Disposal Pit Regrade(Section 3-1) DOZER 2 2.27 $2,597 <br /> 003B Ash Disposal Pit Regrade(Section 3-2) DOZER 2 77.54 $88,683 <br /> 004 Regrade Johnson Coal Stockpile DOZER 1 22.76 $8,244 <br /> 004A D/E Pit Regrade(Spoil Side East) DOZER 8 91.64 $419,242 <br /> 005A D/E Pit Regrade(West) DOZER 6 117.26 $402,333 <br /> 030 Regrade BC Road DOZER 4 72.55 $105,020 <br /> 031 Regrade D-Main Road DOZER 4 53.06 $76,816 <br /> 032 Regrade East and West Ash Roads DOZER 4 87.61 $126,826 <br /> 033 Regrade LOM Roads DOZER 4 158.24 $229,073 <br /> 034 Regrade A Roads(Middle A and North A N pit) DOZER 4 58.27 $84,349 <br /> 035 Regrade N Pit Roads(old LOM,cross-over,ash DOZER 4 21.12 $48,295 <br /> pit) <br /> 036 Regrade C Pit Haul Road DOZER 4 59.52 $86,171 <br /> 039 Regrade East A Haul Roads(East A and East DOZER 4 67.82 $98,174 <br /> ASplit,BridgeRd) <br /> 040 Regrade I/J Roads(I/J Spoil,I Mid,I West) DOZER 4 26.16 $37,892 <br /> 041 Regrade K Pit Haul Roads(Kl EPRL K3) DOZER 4 64.71 $93,678 <br /> 042 Regrade Mine Access Road DOZER 4 23.58 $34,128 <br /> 043 Regrade Explosive Storage Access Road DOZER 4 5.72 $8,273 <br /> 044 Regrade No Name Access Roads#2,#4,5R DOZER 4 10.79 $15,616 <br /> 045 Regrade Potable Water Well Access Road DOZER 4 1.79 $2,586 <br /> 046 Regrade West Pyeatt Access Road(1 and 2) DOZER 4 7.14 $10,342 <br /> 047 Regrade Middle Pyeatt Access Road(1,2 and 3) DOZER 4 6.61 $9,566 <br /> 048 Regrade East Pyeatt Access Road(1,2 and 3) DOZER 4 9.23 $13,367 <br /> 049 Regrade Grouse Access Road DOZER 4 4.57 $6,619 <br /> 050 Regrade West Flume Access Road DOZER 4 2.68 $3,878 <br /> 051 Regrade East Flume Access Road DOZER 4 2.68 $3,878 <br /> 052 Regrade Deal Access Road DOZER 4 2.68 $3,878 <br /> 053 Regrade Horse Access Roads(Horse and Horse I) DOZER 4 6.07 $8,791 <br /> 054 Regrade West Horse Access Road DOZER 4 2.68 $3,878 <br /> 055 Regrade Middle Flume Access Roads(1,2 and 3) DOZER 4 6.92 $10,022 <br /> 056 Regrade Oak Access Roads DOZER 4 3.39 $4,912 <br /> 057 Regrade Sage Access Roads DOZER 4 4.46 $6,463 <br /> 058 Regrade Johnson Access Road DOZER 4 11.07 $16,030 <br /> 059 Jeffway Access Road DOZER 4 10.44 $15,120 <br />