Laserfiche WebLink
construction of associated <br /> Stockpiles <br /> MR-176 06/30/2020 2020 drilling permitting +$7,372.00 <br /> MR-177 08/10/2020 MR-177 adding two D-Seam water +$1,400.00 <br /> injection holes <br /> MR-178 09/30/2020 Addition of RP-A stockpiles +$24,614.00 <br /> MR-179 01/20/2021 Develop up to nine core drill hole +$3,091.00 <br /> pads and a short access road. <br /> MR-180 02/16/2021 MR-180 additional sandstone lens +$3,053.00 <br /> core drilling <br /> MR-181 03/01/2021 Longwall advancement core drilling +$2,610.00 <br /> MR-182 10/13/2021 2021-2022 drilling program +$6,643.00 <br /> TR-73 02/11/2022 DW-1R dewatering hole and pond +$25,590.00 <br /> MR-183 04/26/2022 Relocation ofNI-14 injection well +$0.00 <br /> TR-74 10/19/2022 RP-2/3/4 and RP-5a combination +$0.00 <br /> SECTION III— STATUS OF STIPULATIONS <br /> The stipulation history associated with the Deserado Mine was reviewed as part of this Midterm <br /> Review process. The following is a discussion of the stipulations that were noted as active or <br /> issued as a result of the last Permit Renewal (RN-7). The review included an investigation of the <br /> stipulation response file, revisions to the permit, and the findings document for RN-7. <br /> Stipulations are a binding part of the permit and previously assigned stipulation numbers are not <br /> re-used. Any stipulations associated with the Deserado Mine permit and issued over the life of <br /> the operation which are not discussed in this Midterm Review document have been complied <br /> with or terminated. <br /> There are two active stipulations for the Deserado Mine. All of the stipulations are perpetual in <br /> nature and impose possible future obligations on the permittee when conducting operations on <br /> BLM lands. <br /> Stipulation No. 50 <br /> IF THE OPERATOR DISCOVERS ANY CULTURAL REMAINS, MONUMENTS OR SITES, <br /> OR ANY OBJECT OF ANTIQUITY, OPERATOR SHALL IMMEDIATELY CEASE <br /> ACTIVITY AND REPORT DIRECTLY TO BLM AREA MANAGER. THE BLM SHALL <br /> TAKE ACTION AS REQUIRED UNDER THE ACTS AND REGULATIONS. OPERATOR <br /> SHALL FOLLOW MITIGATION REQUIREMENTS SET FORTH BY BLM CONCERNING <br /> PROTECTION, PRESERVATION OR DISPOSITION OF ANY SITES OR MATERIAL <br /> DISCOVERED. COST OF SALVAGE EXCAVATION, IF NECESSARY, SHALL BE <br /> BORNE BY THE OPERATOR UNLESS OTHERWISE STATED. <br /> Deserado Mine -4- 12/21/2022 <br />