My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-12-21_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2022-12-21_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 6:43:45 AM
Creation date
12/22/2022 5:55:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
12/21/2022
Doc Name Note
Midterm Review & Cost Estimate
Doc Name
Midterm Review Document
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
MT8
Email Name
CCW
THM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPACTION WORK <br /> Task description: Cmpact Refuse at RP 2/3/4,5a,and Facilities Area Refuse <br /> Site: Deserado Mine Permit Action: 2022 Midterm Review Permit/Job#: C1981018 <br /> PROJECT IDENTIFICATION <br /> Task#: 029 State: Colorado Abbreviation: None <br /> Date: 11/9/2022 County: Rio Blanco Filename: C018-029 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: CAT 815F Horsepower: 240 <br /> Compactor Type: Soil-tamping foot Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $110.46 NA <br /> Operating Cost/Hour: $96.20 100 <br /> Operator Cost/Hour: $26.02 NA <br /> Total Unit Cost/Hour: $232.68 <br /> Total Fleet Cost/Hour: $232.68 <br /> MATERIAL QUANTITIES <br /> Loose volume: 380,000 LCY Shrinkage factor: 0.870 <br /> Compacted volume: 330,600 CCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated shrinkage factor: Cat Handbook <br /> HOURLY PRODUCTION Unadjusted hourly production=(W x S x L x Cl/P <br /> Compacted width per pass(W): 6.50 feet <br /> Average Compactor Speed(S): 4.00 mph <br /> Compacted thickness of each lift(L): 10.00 inches <br /> Conversion Constant(C): 16.3 (5,280ft./12in./27cu.ft.) <br /> Required number of machine passes(P): 3 passes <br /> Unadjusted Hourly Unit Production: 1,412.67 CCY/hour <br /> Job Condition Correction Factors Site Altitude: 5,300 feet <br /> Source <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.8300 multiplier <br /> Adjusted Hourly Unit Production: 1,172.51 CCY/Hour <br /> Adjusted Hourly Fleet Production: 1,172.51 CCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Compactor(s) Total job time: 281.96 Hours <br /> Unit cost: $0.198 per CCY Total job cost: $65,606 <br /> CIRCES Cost Estimating Software <br />