Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task#028 Page 4 of 4 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> (min) <br /> 1 6800.00 3.00 1.20 4.20 2051 3.582 <br /> 2 10000.00 -2.00 1.20 -0.80 3893 2.648 <br /> Haul Time: 6.230 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 10000.00 2.00 1.20 3.20 4074 2.814 <br /> 2 6800.00 -3.00 1.20 -1.80 4254 1.648 <br /> Return Time: 4.462 minutes <br /> Total Truck Cycle Time: 13.892 minutes <br /> Loading Tool unit <br /> Production 715.91 LCY/Hour Adjusted for job efficiency: 594.20 LCY/Hour <br /> Truck Unit Production <br /> 113.37 LCY/Hour Adjusted for job efficiency: 94.10 LCY/Hour <br /> Optimal No. of Trucks: 6 Truck(s) Selected Number of Trucks: 4 Truck(s) <br /> Adjusted hourly truck team production: 376.40 LCY/Hour <br /> Adjusted single truck/loader team production: 376.40 LCY/Hour <br /> Adjusted multiple truck/loader team production: 376.40 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 128.41 Hours <br /> Unit cost: $2.306 /LCY Total job cost: $111,460 <br /> CIRCES Cost Estimating Software <br />