Laserfiche WebLink
Form 2 – Public File Page 10 of 14 <br />6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) <br />condition: <br />7. List the seed mixture to be used in the re-establishment of vegetation. See the attached <br />seed mixture calculation to obtain PLS/acre. For assistance with formulating seed <br />mixtures and rates, contact the local NRCS if on private land, BLM/USFS if on public <br />land or State Land Board if on state land. <br />A. Plant name and seeding rate: <br />Plant Name Seeding Rate (PLS/Acre) <br />The road surfaces and drill pads will be scarified and left in rough condition to hold <br />seed and optimize germination. The temporary culvert, if placed, will be removed upon <br />completion of the prospecting program and the road will be regraded to direct run-off to <br />the natural channel downgradient. Improved roads will be reclaimed to existing width of <br />disturbance prior to prospecting. <br />See Attachment 8 for the seed mix provided by the BLM