My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-12-20_PERMIT FILE - P2022019
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2022019
>
2022-12-20_PERMIT FILE - P2022019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 2:20:08 PM
Creation date
12/21/2022 8:18:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2022019
IBM Index Class Name
Permit File
Doc Date
12/20/2022
Doc Name
Application
From
Sunrise Minerals Inc
To
DRMS
Email Name
DMC
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Form 2 – Public File Page 7 of 14 <br />E. Other Disturbances (please describe) <br />F. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to <br />store. <br />G. New Roads: <br />Length (ft): Width (ft): <br />Significantly <br />Upgraded Roads Length (ft): Width (ft): <br />Are culverts or other crossings proposed? If so, please describe: <br />H. Total project area to be disturbed (acres) <br />I. Describe the equipment to be used for the prospecting operations: <br />Existing roads and trails will be utilized and improved as necessary to allow for safe <br />access. Improvements will include tree trimming/removal, blading, adding fill, and <br />stabilizing washout areas with fill and/or a culvert in one location. <br />Exploration and drilling personnel will access the site in pickup trucks. A reverse <br />circulation (RC) drill will be utilized along with support vehicles, such as a pipe truck or <br />trailer, water truck, forklift, and portable light plant/generator. It is anticipated that only <br />one drill rig will be on site at any one time. A bull dozer or excavator and a backhoe may <br />be utilized for road improvement and reclamation. <br />Chemicals and fuels used on site may include diesel fuel, gasoline, hydraulic fluid, and <br />lubricating grease. Approximately 300 gallons of diesel fuel and gasoline will be stored in <br />fuel delivery systems on drill rigs and support vehicles. Approximately 50 pounds of <br />lubricating grease and 35 gallons of hydraulic fluid will be stored on each drill rig and <br />transported by drill trucks. <br />160 <br />1,460 <br />14 <br />12 <br />One culvert is proposed in an area requiring fill to maintain access in the event of a storm event causing run-off. The approximate <br />culvert location is shown on figures 3 and 4. The culvert, if placed, will be removed at the end of prospecting. An alternative to <br />culvert placement will be the placement of fill material that will allow run-off to flow through while maintaining access. <br />0.97 ac
The URL can be used to link to this page
Your browser does not support the video tag.